Revision history of "LPW-E/3.3.1/1252 — Energetic renovation of the seawater wave pool Piratenmeer Büsum" (Q3334039)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

16 February 2024

12 June 2023

11 July 2022

  • curprev 22:2222:22, 11 July 2022DG Regio talk contribs 61,955 bytes +41,729 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

22 January 2022

19 January 2022

19 December 2021

7 December 2021

9 November 2021

5 November 2021

27 October 2021

25 October 2021

  • curprev 08:4808:48, 25 October 2021DG Regio talk contribs 9,527 bytes +145 Changed label, description and/or aliases in en: translated_label
  • curprev 08:4808:48, 25 October 2021DG Regio talk contribs 9,382 bytes +1,918 Created claim: summary (P836): Energetic refurbishment of the Seawater Hallwell Bath, Südstrand 9 in Büsum, facade refurbishment with the application of mineral fibre panels, glass facades and window elements are replaced by post-locking facades with triple glazing in highly thermal insulating design, replacement of the roof shell by warm roof construction with insulation in the low energy standard, reduction of the outdoor water surface by decommissioning the outdoor pool in...

24 October 2021