Revision history of "LPW-E/3.1.1/1361 — Effects of the necessary power grid expansion through electric mobility from the point of view of civil engineering" (Q3333986)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

16 February 2024

12 June 2023

11 July 2022

  • curprev 22:2022:20, 11 July 2022DG Regio talk contribs 50,165 bytes +32,749 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

22 January 2022

19 January 2022

19 December 2021

7 December 2021

9 November 2021

5 November 2021

27 October 2021

25 October 2021

  • curprev 08:4708:47, 25 October 2021DG Regio talk contribs 8,931 bytes +196 Changed label, description and/or aliases in en: translated_label
  • curprev 08:4708:47, 25 October 2021DG Regio talk contribs 8,735 bytes +1,383 Created claim: summary (P836): So far, concrete studies on possible grid expansion measures directly related to the development of electro-mobility are hardly known. The emerging requirements for the existing electricity grid due to the expected charging capacities of future electric vehicles mean that electricity grid expansion will be required. It is important to be able to assess the civil engineering requirements for electricity-grid expansion quickly and in a targeted ma...

24 October 2021