Revision history of "LPW-E/1.2.3/1643 — RoDiB (pipeline digitalisation in operation)" (Q3332996)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

16 February 2024

12 June 2023

5 August 2022

  • curprev 06:2906:29, 5 August 2022DG Regio talk contribs 47,133 bytes +32,068 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

22 January 2022

19 January 2022

19 December 2021

7 December 2021

9 November 2021

5 November 2021

27 October 2021

25 October 2021

  • curprev 08:0608:06, 25 October 2021DG Regio talk contribs 6,622 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0608:06, 25 October 2021DG Regio talk contribs 6,498 bytes +1,460 Created claim: summary (P836): The process to be developed is used for the automated recording of pipes in the built-in state and the associated digital representation of the pipe geometry. In particular, it is intended to meet the high requirements for measuring accuracy in the plant operating environment.Primaryly, the measurement method enables the digitisation of existing plants without the need to shut down these systems. This means enormous time and cost savings for the...

24 October 2021