Revision history of "LPW-E/1.2.3/374 — Optimisation of production processes by marking with a Data Matrix code" (Q3332930)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

16 February 2024

12 June 2023

11 July 2022

  • curprev 21:5221:52, 11 July 2022DG Regio talk contribs 47,709 bytes +30,767 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

22 January 2022

19 January 2022

19 December 2021

7 December 2021

9 November 2021

5 November 2021

27 October 2021

25 October 2021

  • curprev 07:5507:55, 25 October 2021DG Regio talk contribs 8,805 bytes +150 Changed label, description and/or aliases in en: translated_label
  • curprev 07:5507:55, 25 October 2021DG Regio talk contribs 8,655 bytes +1,312 Created claim: summary (P836): All tools that go through a process in the house (tool service or tool making) are marked with a data matrix code using a laser. This code contains a unique number for each tool. After the number, all data relevant to the tool are stored in a database. For example, at every step without a running card, all necessary data are available for each single tool. In addition, the entire life cycle can be traced back for each tool and thus the use of th...

24 October 2021