Revision history of "Construction of 2 charging stations with 4 pumped normal charging points (2x22 kW and 2xmin. 3.7 kW) as public charging infrastructure" (Q3303188)
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.