Revision history of "Until RES 2016 — DOLB Trebnje — Centre Komunala Trebnje" (Q3271248)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

6 March 2024

10 June 2023

8 March 2023

10 October 2022

4 August 2022

  • curprev 23:0123:01, 4 August 2022DG Regio talk contribs 44,142 bytes +26,898 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv, nl, fr, de, it, sl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv,

7 February 2022

14 January 2022

13 January 2022

11 January 2022

29 November 2021

  • curprev 16:5216:52, 29 November 2021DG Regio talk contribs 14,300 bytes +1,347 Created claim: summary (P836): Het doel van de bouw van DOLB Trebnje — Centrum is de productie van energie uit hernieuwbare bronnen en daarmee het aandeel van hernieuwbare energiebronnen in de eindenergieverbruiksbalans te verhogen. Het doel van de operatie is een systeem op afstand met een lengte van 1,129 m te bouwen. Het is de bedoeling om een 750 kW ketel (Fröling Lambdamat 750) + 350 kW (Fröling TI 350) te installeren. De geschatte hoeveelheid warmte die na de voltooiing...
  • curprev 16:5216:52, 29 November 2021DG Regio talk contribs 12,953 bytes +116 Changed label, description and/or aliases in nl: translated_label
  • curprev 15:0615:06, 29 November 2021DG Regio talk contribs 12,837 bytes +1,320 Created claim: summary (P836): Ziel des Baus der DOLB Trebnje – Centre ist es, die Erzeugung von Energie aus erneuerbaren Quellen und damit den Anteil erneuerbarer Energiequellen an der Endenergieverbrauchsbilanz zu steigern. Ziel des Vorhabens ist es, ein Fernsystem mit einer Länge von 1,129 m zu bauen. Es ist geplant, einen 750 kW-Kessel (Fröling Lambdamat 750) + 350 kW (Fröling TI 350) zu installieren. Die geschätzte Wärmemenge, die nach Abschluss des Betriebs verkauft wir...
  • curprev 15:0615:06, 29 November 2021DG Regio talk contribs 11,517 bytes +116 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:2312:23, 27 November 2021DG Regio talk contribs 11,401 bytes +1,391 Created claim: summary (P836): L’objectif de la construction de DOLB Trebnje — Centre est d’augmenter la production d’énergie à partir de sources renouvelables et donc la part des sources d’énergie renouvelables dans le bilan de consommation finale d’énergie. L’objectif de l’opération est de construire un système à distance d’une longueur de 1,129 m. Il est prévu d’installer une chaudière de 750 kW (Fröling Lambdamat 750) + 350 kW (Fröling TI 350), la quantité estimée de chal...
  • curprev 12:2212:22, 27 November 2021DG Regio talk contribs 10,010 bytes +123 Changed label, description and/or aliases in fr: translated_label

20 October 2021

13 October 2021

12 October 2021

  • curprev 12:5112:51, 12 October 2021DG Regio talk contribs 8,176 bytes +514 Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes
  • curprev 10:3110:31, 12 October 2021DG Regio talk contribs 7,662 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 10:3110:31, 12 October 2021DG Regio talk contribs 7,544 bytes +1,310 Created claim: summary (P836): The purpose of the construction of DOLB Trebnje — Centre is to increase the production of energy from renewable sources and thus the share of renewable energy sources in the final energy consumption balance. The aim of the operation is to build a remote system with a length of 1.129 m. It is planned to install a 750 kW boiler (Fröling Lambdamat 750) + 350 kW (Fröling TI 350), the estimated amount of heat sold after the completion of the operatio...

11 October 2021