Revision history of "ALL FOR SCHOOL AND A SCHOOL FOR ALL" (Q326955)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

19 August 2022

  • curprev 01:5201:52, 19 August 2022DG Regio talk contribs 54,386 bytes +35,169 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

11 February 2022

9 February 2022

7 February 2022

27 January 2022

21 December 2021

17 December 2021

7 December 2021

29 December 2020

6 November 2020

  • curprev 14:5614:56, 6 November 2020DG Regio talk contribs 11,353 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5614:56, 6 November 2020DG Regio talk contribs 11,259 bytes −92 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5614:56, 6 November 2020DG Regio talk contribs 11,351 bytes +1,648 Created claim: summary (P836): THE PROJECT DEVELOPED ON THE NEEDS OF THE PUPILS. THE SCHOOL IN ORDER TO REACH THIS CONCLUSION HAS CARRIED OUT AN INITIAL ANALYTICAL RECONNAISSANCE IN ORDER TO USEFULLY PLAN THE INTERVENTION IN COHERENCE BETWEEN NEEDS AND ATTIVIT.THE PROJECT AS A TAILOR-MADE DRESS AIMS TO FIT THE DIFFERENT DIMENSIONS OF DISPERSIONEOSTUDENTS THAT SLOW DOWN THE PATHS OF STUDY WITHDRAWALS GEESE FAIL TO REACH THE STANDARDS OF LEARNING DEBTS LOW LEVELS OF COMPETENZEO...
  • curprev 14:5614:56, 6 November 2020DG Regio talk contribs 9,703 bytes −1,334 Removed claim: summary (P836): THE PROJECT HAS BEEN DRAWN UP ON THE NEEDS OF THE PUPILS. THE SCHOOL TO REACH THIS CONCLUSION HAS CARRIED OUT AN INITIAL ANALYTICAL SURVEY IN ORDER TO BE ABLE TO PROPERLY PLAN THE INTERVENTION IN THE INTERESTS OF CONSISTENCY BETWEEN NEEDS AND ACTIVITIES. THE PROJECT AS A CUSTOMISED SUIT SLOWS DOWN THE DIFFERENT DIMENSIONS OF THE STUDY TRIP, WHICH SLOW DOWN THE COURSES OF STUDY, WHICH DO NOT MEET THE LOW LEVELS OF COMPETENCE OF THE NETHERLANDS,...

30 October 2020

16 July 2020

6 June 2020

20 March 2020

10 March 2020

6 March 2020

3 March 2020

  • curprev 13:0613:06, 3 March 2020DG Regio talk contribs 9,717 bytes +1,334 Created claim: summary (P836): THE PROJECT HAS BEEN DRAWN UP ON THE NEEDS OF THE PUPILS. THE SCHOOL TO REACH THIS CONCLUSION HAS CARRIED OUT AN INITIAL ANALYTICAL SURVEY IN ORDER TO BE ABLE TO PROPERLY PLAN THE INTERVENTION IN THE INTERESTS OF CONSISTENCY BETWEEN NEEDS AND ACTIVITIES. THE PROJECT AS A CUSTOMISED SUIT SLOWS DOWN THE DIFFERENT DIMENSIONS OF THE STUDY TRIP, WHICH SLOW DOWN THE COURSES OF STUDY, WHICH DO NOT MEET THE LOW LEVELS OF COMPETENCE OF THE NETHERLANDS, W...

24 February 2020