Revision history of "Drinking water supply Dry Krajina" (Q3265456)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

9 October 2024

  • curprev 11:3111:31, 9 October 2024DG Regio talk contribs 42,384 bytes +29 Set a claim value: summary (P836): O projeto incluirá 152 085 m de condutas, 7 estações de bombagem, 5 das quais serão novas e 2 modernizações de estações de bombagem e 16 de alimentos para consumo humano, das quais 7 serão novas construções, 9 das quais serão modernizadas, 16 eixos de alívio, 18 eixos de redução e 11 eixos de medição. Tal proporcionará a 12 065 habitantes um abastecimento de água potável de elevada qualidade e mais seguro.

6 March 2024

19 June 2023

10 June 2023

8 March 2023

7 October 2022

6 October 2022

4 August 2022

  • curprev 21:4921:49, 4 August 2022DG Regio talk contribs 43,371 bytes +24,627 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv, nl, fr, de, it, sl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv,

7 February 2022

14 January 2022

13 January 2022

11 January 2022

29 November 2021

  • curprev 16:4416:44, 29 November 2021DG Regio talk contribs 16,112 bytes +1,166 Created claim: summary (P836): Het project omvat 152,085 m pijpleidingen, 7 pompstations, waarvan 5 nieuwe en 2 upgrades van pompstations en 16 watervoedingsmiddelen, waarvan 7 nieuwe constructies, waarvan 9 zullen worden opgewaardeerd, 16 hulpassen, 18 reductieassen en 11 meetassen. Dit zal 12.065 inwoners voorzien van een hoogwaardige en veiligere drinkwatervoorziening., translated_summary
  • curprev 16:4416:44, 29 November 2021DG Regio talk contribs 14,946 bytes +94 Changed label, description and/or aliases in nl: translated_label
  • curprev 13:2813:28, 29 November 2021DG Regio talk contribs 14,852 bytes +1,157 Created claim: summary (P836): Das Projekt umfasst 152,085 m Rohrleitungen, 7 Pumpstationen, davon 5 neue und 2 Upgrades von Pumpstationen und 16 WaterFood, davon 7 Neubauten, von denen 9 umgerüstet werden, 16 Entlastungswellen, 18 Reduktionswellen und 11 Messwellen. Damit erhalten 12.065 Einwohner eine qualitativ hochwertige und sicherere Trinkwasserversorgung., translated_summary
  • curprev 13:2813:28, 29 November 2021DG Regio talk contribs 13,695 bytes +97 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:0912:09, 27 November 2021DG Regio talk contribs 13,598 bytes +1,241 Created claim: summary (P836): Le projet comprendra 152,085 m de canalisations, 7 stations de pompage, dont 5 nouvelles et 2 modernisations de stations de pompage et de 16 approvisionnements en eau, dont 7 seront de nouvelles constructions, dont 9 seront modernisées, 16 puits de relief, 18 arbres de réduction et 11 arbres de mesure. Ainsi, 12 065 habitants bénéficieront d’un approvisionnement en eau potable de haute qualité et plus sûr., translated_summary
  • curprev 12:0912:09, 27 November 2021DG Regio talk contribs 12,357 bytes +106 Changed label, description and/or aliases in fr: translated_label

20 October 2021

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)