Revision history of "IMPROVING ROAD ACCESS TO THE FRESNO SECTOR (THE NEIGHBOURHOODS, CADIZ)" (Q3262280)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 10:1410:14, 11 October 2024DG Regio talk contribs 62,612 bytes +6 Changed label, description and/or aliases in pt
  • curprev 10:1410:14, 11 October 2024DG Regio talk contribs 62,606 bytes −22 Set a claim value: summary (P836): As ações realizadas neste projeto, localizado na província de Cádis, município de Los Barrios, são de dois tipos: 1.- Por um lado, o objetivo é definir uma estrada na área de Infraestruturas Técnicas (Vial 2), a fim de proporcionar acesso rodoviário a esta área e, assim, acabar com a infraestrutura rodoviária interior definida na última alteração ao Los Barrios PGO definitivamente aprovado em 8 de agosto de 2016. Este frasco configura-se como uma es...

7 March 2024

21 December 2023

12 June 2023

10 June 2023

19 August 2022

  • curprev 00:3200:32, 19 August 2022DG Regio talk contribs 60,983 bytes +40,966 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

6 December 2021

14 October 2021

  • curprev 12:2812:28, 14 October 2021DG Regio talk contribs 11,573 bytes +129 Changed label, description and/or aliases in en: translated_label
  • curprev 12:2812:28, 14 October 2021DG Regio talk contribs 11,444 bytes +1,886 Created claim: summary (P836): The actions undertaken in this project, located in the province of Cadiz, municipality of Los Barrios, are of two types: 1.- On the one hand, the aim is to define a road in the Technical Infrastructures area (Vial 2) in order to provide road access to this area and thus end the interior road infrastructure defined in the last amendment to the Los Barrios PGO definitively approved on August 8, 2016. This vial is configured as a road with two lane...

12 October 2021

11 October 2021

9 October 2021