Revision history of "IMPROVING ACCESSIBILITY IN SHELTER STOPS IN DIFFERENT MUNICIPALITIES OF JAÉN" (Q3260565)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 11:3111:31, 9 October 2024DG Regio talk contribs 44,522 bytes +5 Changed label, description and/or aliases in pt
  • curprev 11:3111:31, 9 October 2024DG Regio talk contribs 44,517 bytes +14 Set a claim value: summary (P836): A ação a realizar no domínio da operação proposta consiste em realizar as ações necessárias para garantir a acessibilidade de pessoas e veículos às paragens de abrigo em várias cidades de Jaén, consistindo na execução de obras de infraestrutura e equipamento, tais como: adaptação das vias de acesso, pavimentação dos espaços de espera, construção de baías ou ramais nas estradas, viabilização de passagens para peões, etc.

20 March 2024

11 August 2023

12 June 2023

10 June 2023

19 August 2022

  • curprev 00:0600:06, 19 August 2022DG Regio talk contribs 44,106 bytes +28,067 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

6 December 2021

14 October 2021

  • curprev 11:5911:59, 14 October 2021DG Regio talk contribs 10,301 bytes +136 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5911:59, 14 October 2021DG Regio talk contribs 10,165 bytes +1,240 Created claim: summary (P836): The action to be carried out in the field of the proposed operation is to carry out the necessary actions to guarantee the accessibility of people and vehicles to the shelter stops in various towns of Jaén, consisting of the execution of infrastructure and fitting-out works, such as: adaptation of access routes, paving of waiting spaces, construction of bays or sidings on roads, enabling pedestrian crossings, etc., translated_summary

12 October 2021

9 October 2021