Revision history of "SEALING OF BEAS DE GUADIX LANDFILL (GRANADA)" (Q3259957)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

21 December 2023

29 June 2023

12 June 2023

10 June 2023

22 February 2023

18 August 2022

  • curprev 23:5723:57, 18 August 2022DG Regio talk contribs 83,549 bytes +57,838 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

6 December 2021

21 October 2021

14 October 2021

  • curprev 11:3911:39, 14 October 2021DG Regio talk contribs 13,352 bytes +103 Changed label, description and/or aliases in en: translated_label
  • curprev 11:3911:39, 14 October 2021DG Regio talk contribs 13,249 bytes +2,756 Created claim: summary (P836): THE DECOMMISSIONING AND SEALING PLAN CONSISTS OF THE DEFINITION OF A WORK FOR THE CONDITIONING AND SEALING OF THE LANDFILL AREAS, WHICH MUST MEET THE FOLLOWING REQUIREMENTS: REDUCTION OF ENVIRONMENTAL RISKS, REDUCTION OF HEALTH RISKS, REGULARISATION OF SURFACES TO CONTROL SLOPE INSTABILITY, REDUCTION OF DESTRUCTIVE ACTION DUE TO EROSION, ABRASION, ARROYADEROS, ETC. AND LIMITATION OF LANDFILL SATURATION. THESE CONDITIONS ARE LAID DOWN UNDER THE P...

12 October 2021

11 October 2021

9 October 2021