Revision history of "READAPTATION OF THE DOOR INJECTION PROCESS BY APPLYING CONTINUOUS IMPROVEMENT METHODOLOGIES" (Q3252587)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 11:3011:30, 9 October 2024DG Regio talk contribs 44,883 bytes +13 Changed label, description and/or aliases in pt
  • curprev 11:3011:30, 9 October 2024DG Regio talk contribs 44,870 bytes −52 Set a claim value: summary (P836): O OBJETIVO DO PRESENTE PROJETO É A REABILITAÇÃO DO PROCESSO DE INJECÇÃO DAS PORTAS PELA APLICAÇÃO DE METODOLOGIAS DE MELHORIA CONTÍNUAS DESTINADAS A REDUZIR CUSTOS NÃO QUALITÁVEIS APRESENTADOS PELO PROCESSO DE INJECÇÃO ENTRE 30 % e 50 %. ALTERAÇÃO DA MINDSET PARA RESOLVER OS PROBLEMAS DE EQUIPA ATRAVÉS DE METODOLOGIAS E FERRAMENTAS ADEQUADAS, BASEADAS NA MELHORIA CONTÍNUA (CONDUÇÃO DE SEIS SIGMAS)

22 March 2024

12 June 2023

11 June 2023

18 August 2022

  • curprev 22:0622:06, 18 August 2022DG Regio talk contribs 43,603 bytes +28,130 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

5 December 2021

12 October 2021

10 October 2021

9 October 2021