Revision history of "TEST BENCH UP TO 10 KW OF POWER TO IMPROVE AND OPTIMISE THE MECHANISMS OF WAVE ENERGY GENERATION DEVICES" (Q3252553)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 11:3011:30, 9 October 2024DG Regio talk contribs 49,702 bytes −7 Changed label, description and/or aliases in pt
  • curprev 11:3011:30, 9 October 2024DG Regio talk contribs 49,709 bytes +6 Set a claim value: summary (P836): O projecto irá melhorar e optimizar alguns mecanismos do dispositivo Butterfly, cujo protótipo escala 1: 4 foi testado fora do porto de Pobla de Farnals. Para ele irá conceber e construir um banco de testes mecânicos, onde testar e experimentar com todos os componentes. O teste consistirá em um eixo apoiado em um, fora da estrutura do solo e através de um movimento hidráulico do pistão e flutuadores da força sobre a onda é simulada. sensores de medi...

22 March 2024

12 June 2023

11 June 2023

18 August 2022

  • curprev 22:0522:05, 18 August 2022DG Regio talk contribs 48,384 bytes +31,106 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

5 December 2021

12 October 2021

10 October 2021

9 October 2021