Revision history of "Installation of a biomass boiler in the Impulso Verde building" (Q3235203)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 22:0222:02, 10 October 2024DG Regio talk contribs 39,633 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 10 October 2024DG Regio talk contribs 39,634 bytes −6 Set a claim value: summary (P836): Instalação de uma caldeira a biomassa de pellets, com uma potência nominal de 25 kW, concebida para aquecer uma área total de 677 metros quadrados. A instalação incorpora um silo flexível, com uma capacidade de 3.300 litros, e um permutador com um sistema de limpeza automática.

7 March 2024

29 June 2023

12 June 2023

11 June 2023

22 February 2023

18 August 2022

  • curprev 18:0718:07, 18 August 2022DG Regio talk contribs 38,317 bytes +24,003 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

5 December 2021

21 October 2021

12 October 2021

10 October 2021

9 October 2021