Revision history of "Measures to improve energy efficiency in the Benito Corbal building in Pontevedra" (Q3234940)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 10:0610:06, 11 October 2024DG Regio talk contribs 51,470 bytes +1 Changed label, description and/or aliases in pt
  • curprev 10:0610:06, 11 October 2024DG Regio talk contribs 51,469 bytes −3 Set a claim value: summary (P836): — Auditoria energética, Direção de Obras, Direção de Execução de Obras, Coordenação da Segurança e Saúde, _x000D_ -Obras: demolições e trabalhos anteriores, reforços e consolidações estruturais relacionados com a melhoria da eficiência energética, telhado, caldeira de biomassa, ar condicionado e ventilação de elevada eficiência, melhoria da envolvente, isolamento e impermeabilização, carpintaria exterior, forjamento sanitário, iluminação, proteção c...

12 March 2024

21 December 2023

12 June 2023

11 June 2023

22 February 2023

5 September 2022

17 January 2022

18 December 2021

10 December 2021

5 December 2021

21 October 2021

14 October 2021

  • curprev 09:4409:44, 14 October 2021DG Regio talk contribs 10,677 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 09:4409:44, 14 October 2021DG Regio talk contribs 10,537 bytes +1,391 Created claim: summary (P836): — Energy audit, Works Directorate, Works Implementation Directorate, Safety and Health Coordination, _x000D_ -Works: demolitions and previous works, reinforcements and structural consolidations related to the improvement of energy efficiency, roof, biomass boiler, air conditioning and ventilation of high efficiency, improvement of the envelope, insulation and waterproofing, exterior carpentry, sanitary forging, lighting, fire protection related...

12 October 2021

10 October 2021

9 October 2021