Revision history of "PEONIL ITINERARY AND CYCLIST IN PO308 (PQ 24+ 000/25+ 200)" (Q3234500)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 23:2423:24, 9 October 2024DG Regio talk contribs 47,003 bytes +2 Changed label, description and/or aliases in pt
  • curprev 23:2423:24, 9 October 2024DG Regio talk contribs 47,001 bytes +7 Set a claim value: summary (P836): A construção de um percurso seguro e acessível, para utilização mista (peões e bicicletas), no troço entre os 24+ 000 P.Q. e os 25+ 200 da estrada autónoma PO-308, pela sua margem esquerda (lado do mar). A estrada que é objecto do projecto vai desde a praia Major até Soutullo, dando acesso a várias instalações e áreas de serviço da população residente. Um pequeno caminho também é projetado ao longo da margem direita da estrada (lado terra) que liga...

12 March 2024

12 June 2023

11 June 2023

22 February 2023

18 August 2022

  • curprev 17:5717:57, 18 August 2022DG Regio talk contribs 44,883 bytes +28,694 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

5 December 2021

21 October 2021

14 October 2021

  • curprev 10:3010:30, 14 October 2021DG Regio talk contribs 10,380 bytes +119 Changed label, description and/or aliases in en: translated_label
  • curprev 10:3010:30, 14 October 2021DG Regio talk contribs 10,261 bytes +1,321 Created claim: summary (P836): The construction of a safe and accessible route, for mixed use (pedestrians and bicycles), in the section between the P.Q’s 24+ 000 and 25+ 200 of the autonomous road PO-308, by its left margin (sea side). The road that is the subject of the project runs from Major beach to Soutullo, giving access to various facilities and service areas of the resident population. A small path is also projected along the right bank of the road (land side) that c...

12 October 2021

10 October 2021

9 October 2021