Revision history of "THE INCLUSION THAT C" (Q322495)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

18 August 2022

  • curprev 15:3515:35, 18 August 2022DG Regio talk contribs 55,683 bytes +36,980 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

11 February 2022

9 February 2022

8 February 2022

7 February 2022

27 January 2022

21 December 2021

17 December 2021

7 December 2021

6 November 2020

  • curprev 14:3014:30, 6 November 2020DG Regio talk contribs 10,957 bytes +79 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3014:30, 6 November 2020DG Regio talk contribs 10,878 bytes −75 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3014:30, 6 November 2020DG Regio talk contribs 10,953 bytes +1,806 Created claim: summary (P836): THE PROJECT THE INCLUSION THAT ARISES FROM THE NEED TO MAKE OPERATIONAL THE MISSION OF THE INSTITUTE IN ORDER TO GUARANTEE TO ALL PUPILS THE EDUCATIONAL SUCCESS WITH PARTICULAR ATTENTION TO THOSE WHO HAVE DIFFICULTIES ATTRIBUTABLE TO DSA AND IN GENERAL TO EDUCATIVOSPECIALI NEEDS.THE PROJECT AIMED AT STUDENTS OF PRIMARY AND SECONDARY SCHOOL AND DIVIDED INTO 6 MODULES 3 FOR PRIMARY SCHOOL 2 FOR SECONDARY SCHOOL AND 1 FOR PARENTS. THE REALISATION O...
  • curprev 14:2914:29, 6 November 2020DG Regio talk contribs 9,147 bytes −1,361 Removed claim: summary (P836): THE PURPOSE OF THE ENCLOSED PROJECT IS TO ENSURE THAT THE MISSION DELLISTITUTO BE OPERATIONAL, WITH A VIEW TO ENSURING THAT ALL PUPILS HAVE THE REQUISITE TRAINING IN ORDER TO ENSURE THAT ALL PUPILS ARE TRAINED, WITH PARTICULAR ATTENTION BEING PAID TO THOSE WHO HAVE DIFFICULTY IN DRAWING ATTENTION FROM THE DSA AND IN GENERAL TO THE NEEDS OF THE PUPILS IN PRIMARY AND SECONDARY SCHOOLS, BROKEN DOWN INTO 6 PRIMARY SCHOOL 2 MODULES 3 FOR SECONDARY...

30 October 2020

17 July 2020

6 June 2020

20 March 2020

10 March 2020

6 March 2020

3 March 2020

  • curprev 12:3912:39, 3 March 2020DG Regio talk contribs 9,204 bytes +1,361 Created claim: summary (P836): THE PURPOSE OF THE ENCLOSED PROJECT IS TO ENSURE THAT THE MISSION DELLISTITUTO BE OPERATIONAL, WITH A VIEW TO ENSURING THAT ALL PUPILS HAVE THE REQUISITE TRAINING IN ORDER TO ENSURE THAT ALL PUPILS ARE TRAINED, WITH PARTICULAR ATTENTION BEING PAID TO THOSE WHO HAVE DIFFICULTY IN DRAWING ATTENTION FROM THE DSA AND IN GENERAL TO THE NEEDS OF THE PUPILS IN PRIMARY AND SECONDARY SCHOOLS, BROKEN DOWN INTO 6 PRIMARY SCHOOL 2 MODULES 3 FOR SECONDARY SC...

26 February 2020

24 February 2020