Revision history of "Pedestrian itinerary on the road BV-2002 from the service road of the channel on the right to the roundabout of access to the railway station of the Generalitat" (Q3216318)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 10:0410:04, 11 October 2024DG Regio talk contribs 43,089 bytes +7 Changed label, description and/or aliases in pt
  • curprev 10:0410:04, 11 October 2024DG Regio talk contribs 43,082 bytes +7 Set a claim value: summary (P836): A operação consiste em um projeto único que cria uma ciclovia entre a estrada Bv-2002 do cruzamento no bairro de Sant Roc para a estação FGC. Esta estrada permitirá a ligação entre os dois pontos, as zonas industriais e os centros de geração de mobilidade, a redução da utilização de veículos e a emissão de CO2 para a atmosfera.

22 March 2024

11 August 2023

12 June 2023

4 August 2022

  • curprev 15:5715:57, 4 August 2022DG Regio talk contribs 42,615 bytes +27,170 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

10 December 2021

5 December 2021

12 October 2021

9 October 2021