Revision history of "Expansion of the Renewable Energy Autonomous Hybrid Systems Laboratory" (Q3211550)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 11:3011:30, 8 October 2024DG Regio talk contribs 71,749 bytes 0 Changed label, description and/or aliases in pt
  • curprev 11:3011:30, 8 October 2024DG Regio talk contribs 71,749 bytes +52 Set a claim value: summary (P836): O objetivo geral do projeto é expandir o laboratório existente de «Sistemas Autónomos Híbridos de Energia Renovável», a fim de alcançar três objetivos específicos: 1) Produção de mais eletricidade produzida a partir de fontes renováveis; (2) Aumento da capacidade de produção de hidrogénio renovável e (3) inclusão de uma fonte de energia de carga e descarga rápidas para satisfazer a procura instantânea. Os objetivos (1) e (2) andam juntos, já que o (...

20 March 2024

21 December 2023

12 June 2023

10 June 2023

18 August 2022

  • curprev 12:4012:40, 18 August 2022DG Regio talk contribs 69,358 bytes +47,190 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

5 December 2021

14 October 2021

  • curprev 08:4508:45, 14 October 2021DG Regio talk contribs 12,210 bytes +129 Changed label, description and/or aliases in en: translated_label
  • curprev 08:4508:45, 14 October 2021DG Regio talk contribs 12,081 bytes +2,148 Created claim: summary (P836): The overall objective of the project is to expand the existing laboratory of “Autonomous Hybrid Renewable Energy Systems” in order to achieve three specific objectives: (1) generation of more renewable electricity; (2) Increased renewable hydrogen generation capacity and (3) inclusion of a fast-loading and unloading power source to meet instantaneous demands. The objectives (1) and (2) go together, as the (2) is satisfied with a new electrolyser...

11 October 2021

10 October 2021

9 October 2021