Revision history of "As a basic premise when considering the intervention and defining the project, it has been intended to maintain the geometry and functionality that originally had the building, at the time of its const" (Q3206447)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

20 December 2023

12 June 2023

10 June 2023

1 March 2023

22 February 2023

18 August 2022

  • curprev 11:1811:18, 18 August 2022DG Regio talk contribs 65,841 bytes +44,437 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

5 December 2021

21 October 2021

14 October 2021

  • curprev 08:0808:08, 14 October 2021DG Regio talk contribs 12,113 bytes +261 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0808:08, 14 October 2021DG Regio talk contribs 11,852 bytes +2,024 Created claim: summary (P836): As a basic premise when considering the intervention and defining the project, it has been intended to maintain the geometry and functionality that the building originally had, at the time of its construction, but adapting it to the most current and innovative construction systems, installations and finishes._x000D_ It was wanted to give the utmost importance to the energy efficiency of the building, through a system that allows thermal insulati...

11 October 2021

10 October 2021

9 October 2021