Revision history of "The object of this project is the realisation of the energy renovation in the building of the central center of the Port Authority of Las Palmas through the participation in the gaps of fachad" (Q3206213)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 11:0711:07, 9 October 2024DG Regio talk contribs 48,545 bytes +2 Changed label, description and/or aliases in pt
  • curprev 11:0711:07, 9 October 2024DG Regio talk contribs 48,543 bytes +4 Set a claim value: summary (P836): O objetivo deste projeto é a realização da renovação energética no edifício do centro central da Autoridade Portuária de Las Palmas através da intervenção nas aberturas da fachada do edifício, bem como na instalação elétrica e iluminação do mesmo para que possa obter uma maior eficiência energética no funcionamento do edifício, de forma a ajudar a alcançar uma transição para uma economia de baixo carbono no setor portuário.

12 March 2024

20 December 2023

12 June 2023

10 June 2023

1 March 2023

22 February 2023

18 August 2022

  • curprev 11:1511:15, 18 August 2022DG Regio talk contribs 46,194 bytes +29,333 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

5 December 2021

21 October 2021

13 October 2021

  • curprev 01:5301:53, 13 October 2021DG Regio talk contribs 10,589 bytes +252 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5301:53, 13 October 2021DG Regio talk contribs 10,337 bytes +1,273 Created claim: summary (P836): The object of this project is the realisation of the energy renovation in the building of the central center of the Port Authority of Las Palmas through the intervention in the openings of the facade of the building, as well as in the electrical installation and lighting of it so that it can obtain a greater energy efficiency in the operation of the building, in such a way as to help achieve a transition to a low carbon economy in the port secto...

11 October 2021

10 October 2021

9 October 2021