Revision history of "OT6 LA6 PROJECT FOR THE REGENERATION OF SPACES ON THE GUADIANA RIVER FRONT. #CONECTATE TO THE RIVER" (Q3203440)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 21:4721:47, 10 October 2024DG Regio talk contribs 57,491 bytes +2 Changed label, description and/or aliases in pt
  • curprev 21:4721:47, 10 October 2024DG Regio talk contribs 57,489 bytes −18 Set a claim value: summary (P836): O objetivo é recuperar os espaços residuais entre as últimas construções do centro urbano no extremo oeste da cidade e o rio Guadiana em um comprimento de cerca de 1115 metros. Nesta área, que é objeto de várias linhas de ação previstas na estratégia AYAMONTE MIRA AL RIO, pretende-se recuperar os espaços residuais degradados adjacentes ao próprio rio, incluindo a extensão da plataforma de uso urbano no troço do Cais Norte, que alivia a reduzida dime...

23 March 2024

20 December 2023

12 June 2023

10 June 2023

18 August 2022

  • curprev 10:3210:32, 18 August 2022DG Regio talk contribs 56,237 bytes +36,354 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

5 December 2021

13 October 2021

  • curprev 00:3000:30, 13 October 2021DG Regio talk contribs 12,204 bytes +158 Changed label, description and/or aliases in en: translated_label
  • curprev 00:3000:30, 13 October 2021DG Regio talk contribs 12,046 bytes +1,700 Created claim: summary (P836): The aim is to recover the residual spaces between the last constructions of the urban centre in the west end of the city and the Guadiana river in a length of about 1115 meters. In this area, which is the subject of several action lines envisaged in the AYAMONTE MIRA AL RIO strategy, it is intended to recover the degraded residual spaces adjacent to the river itself, including the extension of the urban use platform in the section of the North P...

11 October 2021

10 October 2021

8 October 2021