Revision history of "REQUEST FOR ASSISTANCE FOR THE IMPLEMENTATION OF A PROJECT IN VALENCIA 3, WITHIN THE PROGRAMME TO EXTEND THE COVERAGE OF THE NEXT GENERATION ACCESS NETWORKS (NGA) OF VERY HIGH SPEED (100 MBPS OR HIGHER). LINE A." (Q3203093)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 23:1323:13, 9 October 2024DG Regio talk contribs 51,900 bytes +2 Changed label, description and/or aliases in pt
  • curprev 23:1323:13, 9 October 2024DG Regio talk contribs 51,898 bytes −2 Set a claim value: summary (P836): Para a realização deste projeto - VALÉNCIA (III) - a tecnologia proposta para a rede de acesso de muito alta velocidade é a GPON, num cenário «Fibre to Home» (FTTH). Esta tecnologia visa alargar a cobertura a um total de 34 centros populacionais, 28 centros populacionais nos seguintes municípios da província de Alicante/Alacant: Benigembla, Benidoleig, Murla, Orba, Parcent, Pedreguer, El Rafol D’Almunia, La Vall de Laguar, El Verger e Els Poblets, e...

7 March 2024

20 December 2023

11 August 2023

12 June 2023

10 June 2023

18 August 2022

  • curprev 10:2710:27, 18 August 2022DG Regio talk contribs 50,265 bytes +32,606 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

13 October 2021

  • curprev 00:5700:57, 13 October 2021DG Regio talk contribs 10,886 bytes +271 Changed label, description and/or aliases in en: translated_label
  • curprev 00:5700:57, 13 October 2021DG Regio talk contribs 10,615 bytes +1,394 Created claim: summary (P836): For the realisation of this project -VALENCIA (III)- the proposed technology for the very high-speed access network is GPON, in a “Fibre to Home” (FTTH) scenario. This technology aims to extend the coverage to a total of 34 population centres, 28 population centres in the following municipalities of the province of Alicante/Alacant: Benigembla, Benidoleig, Murla, Orba, Parcent, Pedreguer, El Rafol D’Almunia, La Vall de Laguar, El Verger and Els...

12 October 2021

11 October 2021

8 October 2021