Revision history of "REHABILITATION OF FACADES IN CDAD PROP CL VALENTÍN BERRIOCHOA, N.1 OF BASAURI" (Q3200113)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 11:1411:14, 8 October 2024DG Regio talk contribs 74,827 bytes −3 Changed label, description and/or aliases in pt
  • curprev 11:1411:14, 8 October 2024DG Regio talk contribs 74,830 bytes +13 Set a claim value: summary (P836): A reabilitação prevista das fachadas consiste na alteração do sistema de envolvente. _x000D_ atualmente as fachadas são feitas de placa de tijolo caravista. As fachadas externas sobrevoam o alinhamento nos andares superiores. Em ambas as fachadas há uma faixa de varandas cobertas acabadas em argamassa pintada. _x000D_ a solução adotada consiste em um sistema de fachada ventilada de placas cerâmicas alveolares, a fim de melhorar o isolamento térmico....

7 March 2024

20 December 2023

12 June 2023

10 June 2023

1 March 2023

22 February 2023

4 August 2022

  • curprev 13:5613:56, 4 August 2022DG Regio talk contribs 72,461 bytes +49,555 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

21 October 2021

14 October 2021

  • curprev 07:5907:59, 14 October 2021DG Regio talk contribs 12,561 bytes +137 Changed label, description and/or aliases in en: translated_label
  • curprev 07:5907:59, 14 October 2021DG Regio talk contribs 12,424 bytes +2,327 Created claim: summary (P836): The planned rehabilitation of facades consists of the change of the envelope system. _x000D_ currently the facades are made of caravista brick plate. External facades fly over alignment on the upper floors. On both facades there is a strip of covered balconies finished in painted mortar. _x000D_ the solution adopted consists of a ventilated façade system of alveolar ceramic plates, in order to improve thermal insulation. _x000D_ the rehabilitati...

11 October 2021

10 October 2021

8 October 2021