Revision history of "CONFECTIONERY MANDUL, S.L.U." (Q3199256)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 09:5709:57, 11 October 2024DG Regio talk contribs 42,157 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:5709:57, 11 October 2024DG Regio talk contribs 42,157 bytes −6 Set a claim value: summary (P836): Os investimentos constituem uma extensão, a ser realizada no pol. Ind. Las Viñas, em Malagon, para adaptar a capacidade produtiva para aumentar a demanda por seus produtos._x000D_ _x000D_ Para isso, um edifício industrial de 5.352,50 m2 e um armazém de 1.757,31 m2 serão construídos, com a instalação dos equipamentos produtivos necessários.

23 March 2024

20 December 2023

12 June 2023

10 June 2023

1 March 2023

22 February 2023

18 August 2022

  • curprev 09:2609:26, 18 August 2022DG Regio talk contribs 39,772 bytes +25,207 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

21 October 2021

12 October 2021

11 October 2021

10 October 2021

8 October 2021