Revision history of "ENERGY MEASUREMENT SYSTEM OPTIMISED FOR THREE POINTS OF ENERGY CONSUMPTION FROM THE SAME DEVICE" (Q3189740)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 21:4121:41, 10 October 2024DG Regio talk contribs 86,202 bytes +3 Changed label, description and/or aliases in pt
  • curprev 21:4121:41, 10 October 2024DG Regio talk contribs 86,199 bytes +44 Set a claim value: summary (P836): O principal projeto do projeto é desenvolver uma placa eletrónica que incorpore algoritmos de controlo avançados no firmware e juntamente com o desenvolvimento das aplicações e sistemas necessários que permitam a medição de variáveis elétricas de três pontos de medição trifásicos, seis pontos de medição bifásicos ou nove pontos de medição monofásicos, com e sem neutro, a partir de um único dispositivo, para utilização pelos agentes envolvidos na cad...

7 March 2024

20 December 2023

12 June 2023

10 June 2023

18 August 2022

  • curprev 07:0807:08, 18 August 2022DG Regio talk contribs 83,799 bytes +58,272 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

12 October 2021

  • curprev 22:1622:16, 12 October 2021DG Regio talk contribs 13,410 bytes +154 Changed label, description and/or aliases in en: translated_label
  • curprev 22:1622:16, 12 October 2021DG Regio talk contribs 13,256 bytes +2,749 Created claim: summary (P836): The main project of the project is to develop an electronic board that incorporates advanced control algorithms in the firmware and along with the development of the necessary applications and systems that allow the measurement of electrical variables of three three-phase measuring points, six two-phase or nine single-phase measuring points, with and without neutral, from a single device, for use by the agents involved in the value chain of the...

11 October 2021

10 October 2021

8 October 2021