Revision history of "Technical Assistance to the Management of the ERDF Funds" (Q3186357)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 11:0011:00, 8 October 2024DG Regio talk contribs 51,255 bytes +14 Set a claim value: summary (P836): Apoiar a atividade de gestão do Programa Operacional através do esforço de gestão das Estratégias de Desenvolvimento Urbano Sustentável e Integrado incluídas no Eixo Prioritário 12 do presente P.O. incluem, nomeadamente, as despesas relacionadas com a externalização de uma equipa de apoio à Entidade Local, os custos de pessoal próprio envolvidos na gestão, as despesas de deslocação necessárias para a gestão e o acompanhamento da Estratégia como assi...

23 March 2024

20 December 2023

12 June 2023

10 June 2023

18 August 2022

  • curprev 06:2006:20, 18 August 2022DG Regio talk contribs 49,961 bytes +32,546 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

12 October 2021

  • curprev 21:4821:48, 12 October 2021DG Regio talk contribs 10,707 bytes +1,476 Created claim: summary (P836): Support the management activity of the Operational Programme through the effort in the management of the Sustainable and Integrated Urban Development Strategies included in Priority Axis 12 of this P.O. include, inter alia, expenditure related to the outsourcing of a support team to the Local Entity, own staff costs involved in management, travel expenses necessary for the management and follow-up of the Strategy as assistance to monitoring comm...
  • curprev 21:4821:48, 12 October 2021DG Regio talk contribs 9,231 bytes −1,476 Removed claim: summary (P836): Support the management activity of the Operational Programme through the effort in the management of the Sustainable and Integrated Urban Development Strategies included in Priority Axis 12 of this P.O. include, inter alia, expenditure related to the outsourcing of a support team to the Local Entity, own staff costs involved in management, travel expenses necessary for the management and follow-up of the Strategy as assistance to monitoring co...
  • curprev 21:2721:27, 12 October 2021DG Regio talk contribs 10,707 bytes +115 Changed label, description and/or aliases in en: translated_label
  • curprev 21:2721:27, 12 October 2021DG Regio talk contribs 10,592 bytes +1,476 Created claim: summary (P836): Support the management activity of the Operational Programme through the effort in the management of the Sustainable and Integrated Urban Development Strategies included in Priority Axis 12 of this P.O. include, inter alia, expenditure related to the outsourcing of a support team to the Local Entity, own staff costs involved in management, travel expenses necessary for the management and follow-up of the Strategy as assistance to monitoring comm...
  • curprev 16:3816:38, 12 October 2021DG Regio talk contribs 9,116 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:1613:16, 12 October 2021DG Regio talk contribs 8,683 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location

8 October 2021