Revision history of "INSTALLATIONS AND NETWORKS (BIOMASS)" (Q3176646)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

1 March 2023

22 February 2023

18 August 2022

  • curprev 04:1404:14, 18 August 2022DG Regio talk contribs 75,008 bytes +51,168 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

12 October 2021

  • curprev 18:5918:59, 12 October 2021DG Regio talk contribs 13,191 bytes +2,463 Created claim: summary (P836): The operation is aimed at the improvement of biomass installations and their connection to municipal public buildings, and is part of the Action Line 4 Improvement, adaptation and installation of equipment and networks for supply (biomass) and the ERDF specific objective OE4.5.3. Improving energy efficiency and increasing renewable energy in urban areas. This action will effectively contribute to the enhancement of existing biomass resources in...
  • curprev 18:5918:59, 12 October 2021DG Regio talk contribs 10,728 bytes −2,463 Removed claim: summary (P836): The operation is aimed at the improvement of biomass installations and their connection to municipal public buildings, and is part of the Action Line 4 Improvement, adaptation and installation of equipment and networks for supply (biomass) and the ERDF specific objective OE4.5.3. Improving energy efficiency and increasing renewable energy in urban areas. This action will effectively contribute to the enhancement of existing biomass resources i...
  • curprev 18:3518:35, 12 October 2021DG Regio talk contribs 13,191 bytes +95 Changed label, description and/or aliases in en: translated_label
  • curprev 18:3518:35, 12 October 2021DG Regio talk contribs 13,096 bytes +2,463 Created claim: summary (P836): The operation is aimed at the improvement of biomass installations and their connection to municipal public buildings, and is part of the Action Line 4 Improvement, adaptation and installation of equipment and networks for supply (biomass) and the ERDF specific objective OE4.5.3. Improving energy efficiency and increasing renewable energy in urban areas. This action will effectively contribute to the enhancement of existing biomass resources in...

10 October 2021

9 October 2021

8 October 2021