Revision history of "GRANDILLA CENTRAL EOLICO PARK" (Q3170553)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 10:4510:45, 9 October 2024DG Regio talk contribs 46,840 bytes +5 Set a claim value: summary (P836): GRANADILLA CENTRAL EOLICO PARK DE POTÊNCIA RATED 16,1 MW, CONSTITUÍDO POR 7 VELOCIDADES ENERCON E70 DE 2300 KW CADA CADA E 98M DE ALTURA DE COMPRESSÃO. _x000D_ os AEROGERADORES, O CENTRO COMUNITÁRIO E O CONTROLO DO PARQUE EOLICAL situar-se-ão no RECINTO DE GRANADILLA TERMICAL CENTRAL, MIENTRAS QUE A LINHA DE MEIOS DE COMUNIDADE DA LINHA DE EVACUAÇÃO DISCURRIDO pelas margens de ZONAS VIAIS E COMUNAIS DE GRANADILLA INDUSTRIAL POLIGONO, TEM A LOCALIZAÇ...

22 March 2024

20 December 2023

12 June 2023

10 June 2023

22 February 2023

4 August 2022

  • curprev 10:2310:23, 4 August 2022DG Regio talk contribs 44,843 bytes +28,437 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

12 October 2021

  • curprev 17:0017:00, 12 October 2021DG Regio talk contribs 10,381 bytes +88 Changed label, description and/or aliases in en: translated_label
  • curprev 17:0017:00, 12 October 2021DG Regio talk contribs 10,293 bytes +1,362 Created claim: summary (P836): GRANADILLA CENTRAL EOLICO PARK OF RATED POWER 16.1 MW, CONSISTING OF 7 ENERCON E70 WIND TURBINES OF 2,300 KW EACH AND 98M OF BUSHING HEIGHT. _x000D_ the AEROGENERATORS AND THE COMMUNITY CENTER AND CONTROL OF THE EOLICAL PARK will be located within the RECINTE OF GRANADILLA TERMICAL CENTRAL, MIENTRAS THAT THE MEDIA LINE OF THE EVACUATION LINE DISCURRIED by margins of VIALAL AND COMMUNAL ZONAS OF GRANADILLA INDUSTRIAL POLIGONO, it HAS THE LOCATION...

10 October 2021

9 October 2021

8 October 2021