Revision history of "Castile and LEON 4. Extension Width Band New Generation. Call for tenders 1/2018." (Q3157849)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 09:3209:32, 11 October 2024DG Regio talk contribs 70,685 bytes +1 Changed label, description and/or aliases in pt
  • curprev 09:3209:32, 11 October 2024DG Regio talk contribs 70,684 bytes −10 Set a claim value: summary (P836): A correta acreditação da execução do projeto depende da consecução dos objetivos, que consistem em fornecer cobertura de serviços de banda larga a débitos de, pelo menos, 100 Mbps a 20 819 unidades imobiliárias, através de uma solução tecnológica baseada na norma GPON num cenário de fibra ótica para uso doméstico (FTTH), a 38 entidades populacionais únicas e a 9 zonas abaixo da entidade populacional singular, pertencentes aos municípios de El Arenal...

22 March 2024

20 December 2023

11 August 2023

12 June 2023

10 June 2023

1 March 2023

22 February 2023

18 August 2022

  • curprev 00:0600:06, 18 August 2022DG Regio talk contribs 69,045 bytes +46,712 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

4 December 2021

20 October 2021

12 October 2021

  • curprev 16:2416:24, 12 October 2021DG Regio talk contribs 12,405 bytes +2,299 Created claim: summary (P836): The correct accreditation of the implementation of the project is conditional on the achievement of the objectives, consisting of providing coverage of broadband services at speeds of at least 100 Mbps to 20,819 real estate units, through a technological solution based on the GPON standard in a Fiber Optical to Home (FTTH) scenario, to 38 unique population entities and 9 areas below the singular population entity, belonging to the municipalities...
  • curprev 16:2416:24, 12 October 2021DG Regio talk contribs 10,106 bytes −2,299 Removed claim: summary (P836): The correct accreditation of the implementation of the project is conditional on the achievement of the objectives, consisting of providing coverage of broadband services at speeds of at least 100 Mbps to 20,819 real estate units, through a technological solution based on the GPON standard in a Fiber Optical to Home (FTTH) scenario, to 38 unique population entities and 9 areas below the singular population entity, belonging to the municipaliti...
  • curprev 16:1016:10, 12 October 2021DG Regio talk contribs 12,405 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 16:1016:10, 12 October 2021DG Regio talk contribs 12,265 bytes +2,299 Created claim: summary (P836): The correct accreditation of the implementation of the project is conditional on the achievement of the objectives, consisting of providing coverage of broadband services at speeds of at least 100 Mbps to 20,819 real estate units, through a technological solution based on the GPON standard in a Fiber Optical to Home (FTTH) scenario, to 38 unique population entities and 9 areas below the singular population entity, belonging to the municipalities...
  • curprev 11:4711:47, 12 October 2021DG Regio talk contribs 9,966 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 07:4807:48, 12 October 2021DG Regio talk contribs 9,533 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location

8 October 2021