Revision history of "DEVELOPMENT OF TECHNIQUES FOR REINFORCING CONCRETE STRUCTURES WITH ADVANCED MATERIALS AND THEIR MECHANICAL STRUCTURAL BEHAVIOR MODELS FOR THE EXTENSION OF THEIR USEFUL LIFE" (Q3152689)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 10:0510:05, 9 October 2024DG Regio talk contribs 125,201 bytes −3 Changed label, description and/or aliases in pt
  • curprev 10:0510:05, 9 October 2024DG Regio talk contribs 125,204 bytes +120 Set a claim value: summary (P836): A ADAPTAÇÃO DAS INFRA-ESTRUTURAS DE TRANSPORTE EXISTENTES ÀS CONDIÇÕES ATUALIZADAS REQUERE frequentemente A CONSIDERAÇÃO DE CARgas SUPERIOR ÀS INCLUÍDAS NOS REGULAMENTOS DO PROJECTO UTILIZADOS NA CONCEPÇÃO INICIAL DA INFRA-ESTRUTURA. O projecto coordenado em que este projecto faz parte do projecto tem por objectivo, no primeiro lugar, desenvolver um modelo mecânico contra pedidos normais e volumosos menos conservativos do que os modelos dos regulame...

23 March 2024

20 December 2023

12 June 2023

10 June 2023

17 August 2022

  • curprev 22:5322:53, 17 August 2022DG Regio talk contribs 123,088 bytes +87,567 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 16:5616:56, 2 December 2021DG Regio talk contribs 21,437 bytes +4,616 Created claim: summary (P836): POUR ADAPTER LES INFRASTRUCTURES DE TRANSPORT EXISTANTES AUX CONDITIONS ACTUELLES, IL EST SOUVENT NÉCESSAIRE DE PRENDRE EN CONSIDÉRATION DES CHARGES PLUS ÉLEVÉES QUE CELLES PRÉVUES DANS LES RÈGLEMENTS DE PROJET UTILISÉS DANS LA CONCEPTION INITIALE DE L’INFRASTRUCTURE. LE PROJET COORDONNÉ DANS LEQUEL CE PROJET FAIT PARTIE DU PROJET VISE, EN PREMIER LIEU, À DÉVELOPPER UN MODÈLE MÉCANIQUE CONTRE DES DEMANDES NORMALES ET TANGENTES MOINS CONSERVATRIC...
  • curprev 16:5616:56, 2 December 2021DG Regio talk contribs 16,821 bytes +267 Changed label, description and/or aliases in fr: translated_label

12 October 2021

  • curprev 15:3315:33, 12 October 2021DG Regio talk contribs 16,554 bytes +232 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3315:33, 12 October 2021DG Regio talk contribs 16,322 bytes +4,254 Created claim: summary (P836): THE ADAPTATION OF EXISTING TRANSPORT INFRASTRUCTURES TO CURRENT CONDITIONS OFTEN REQUIRES THE CONSIDERATION OF HIGHER LOADS THAN THOSE INCLUDED IN THE PROJECT REGULATIONS USED IN THE INITIAL CONCEPTION OF THE INFRASTRUCTURE. THE COORDINATED PROJECT IN WHICH THIS PROJECT IS PART OF THE PROJECT AIMS, IN THE FIRST PLACE, TO DEVELOP A MECHANICAL MODEL AGAINST NORMAL AND TANGENT REQUESTS LESS CONSERVATIVE THAN THE MODELS OF THE CURRENT REGULATIONS, B...

10 October 2021

9 October 2021

8 October 2021