Revision history of "ACQUISITION, IMPROVEMENT AND INSTALLATION OF SCIENTIFIC AND TECHNOLOGICAL EQUIPMENT FOR PROCESSING AND MACROMOLECULAR AND FUNCTIONAL KNOWLEDGE OF PROCESSED FOODS" (Q3146331)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 10:0510:05, 9 October 2024DG Regio talk contribs 72,193 bytes +11 Changed label, description and/or aliases in pt
  • curprev 10:0510:05, 9 October 2024DG Regio talk contribs 72,182 bytes +3 Set a claim value: summary (P836): Na IATA-CSIC, a disponibilidade de equipamentos e infra-estruturas foi drasticamente reduzida nos últimos anos. Por este motivo, o mais recente plano estratégico para a viabilidade da investigação e transferência de resultados, após a análise dos recursos disponíveis, comprometeu-se a criar e fornecer infraestruturas e equipamentos comuns para prestar serviços a todos os grupos de investigação IATA-CSIC que otimizem os recursos humanos e as infraest...

22 March 2024

20 December 2023

12 June 2023

10 June 2023

4 August 2022

  • curprev 07:3507:35, 4 August 2022DG Regio talk contribs 69,828 bytes +47,495 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 15:3015:30, 2 December 2021DG Regio talk contribs 14,959 bytes +2,374 Created claim: summary (P836): À l’IATA-CSIC, la disponibilité des équipements et des infrastructures a été considérablement réduite ces dernières années. Pour cette raison, le dernier plan stratégique pour la faisabilité de la recherche et le transfert des résultats, après analyse des ressources disponibles, s’est engagé à créer et à fournir des infrastructures et des équipements communs pour fournir des services à tous les groupes de recherche IATA-CSIC optimisant les resso...
  • curprev 15:3015:30, 2 December 2021DG Regio talk contribs 12,585 bytes +258 Changed label, description and/or aliases in fr: translated_label

20 October 2021

12 October 2021

  • curprev 14:5814:58, 12 October 2021DG Regio talk contribs 12,329 bytes +2,133 Created claim: summary (P836): At IATA-CSIC, the availability of equipment and infrastructure has been drastically reduced in recent years. For this reason, the latest strategic plan for the feasibility of research and transfer of results, after the analysis of the available resources, committed to the creation and provision of common infrastructure and equipment to provide services to all IATA-CSIC research groups optimising human resources and infrastructure. Research group...
  • curprev 14:5814:58, 12 October 2021DG Regio talk contribs 10,196 bytes −2,133 Removed claim: summary (P836): At IATA-CSIC, the availability of equipment and infrastructure has been drastically reduced in recent years. For this reason, the latest strategic plan for the feasibility of research and transfer of results, after the analysis of the available resources, committed to the creation and provision of common infrastructure and equipment to provide services to all IATA-CSIC research groups optimising human resources and infrastructure. Research gro...
  • curprev 14:4214:42, 12 October 2021DG Regio talk contribs 12,329 bytes +221 Changed label, description and/or aliases in en: translated_label
  • curprev 14:4214:42, 12 October 2021DG Regio talk contribs 12,108 bytes +2,133 Created claim: summary (P836): At IATA-CSIC, the availability of equipment and infrastructure has been drastically reduced in recent years. For this reason, the latest strategic plan for the feasibility of research and transfer of results, after the analysis of the available resources, committed to the creation and provision of common infrastructure and equipment to provide services to all IATA-CSIC research groups optimising human resources and infrastructure. Research group...

10 October 2021

9 October 2021

8 October 2021