Revision history of "REPLACEMENT OF DRYING FURNACES" (Q3144256)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

20 December 2023

12 June 2023

10 June 2023

17 August 2022

  • curprev 20:5620:56, 17 August 2022DG Regio talk contribs 53,713 bytes +35,450 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 15:2915:29, 2 December 2021DG Regio talk contribs 12,879 bytes +1,801 Created claim: summary (P836): Le projet consiste en le remplacement de 10 fours de séchage à couvercle verni. Les fours actuellement disponibles sont de conception et de construction simples et, bien qu’ils accomplissent correctement leurs tâches, ils n’offrent pas une performance optimale en termes de consommation d’énergie. Les nouveaux fours auront un contrôle électronique de haute précision, capable d’une régulation de température entièrement précise en temps réel, perme...
  • curprev 15:2915:29, 2 December 2021DG Regio talk contribs 11,078 bytes +93 Changed label, description and/or aliases in fr: translated_label

12 October 2021

  • curprev 14:0114:01, 12 October 2021DG Regio talk contribs 10,985 bytes +89 Changed label, description and/or aliases in en: translated_label
  • curprev 14:0114:01, 12 October 2021DG Regio talk contribs 10,896 bytes +1,640 Created claim: summary (P836): The project consists of the replacement of 10 varnished lid drying furnaces. The furnaces that are currently available are of simple design and construction and, although they perform their tasks correctly, they do not offer optimal performance in terms of energy consumption. The new furnaces will have high precision electronic control, capable of fully accurate temperature regulation in real time, allowing always to work at the minimum working...

10 October 2021

9 October 2021

8 October 2021