Revision history of "Sustainable Urban Mobility Belt of Villanueva de la Serena." (Q3134965)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 10:0310:03, 9 October 2024DG Regio talk contribs 50,325 bytes +4 Changed label, description and/or aliases in pt
  • curprev 10:0310:03, 9 October 2024DG Regio talk contribs 50,321 bytes −14 Set a claim value: summary (P836): A Operação consiste na Execução e continuidade na execução da ciclovia que constitui o Cinturão de Mobilidade Urbana de Villanueva de la Serena de acordo com o percurso definido no SUMP da Conurbación Don Benito Villanueva de la Serena. O objetivo é criar um itinerário misto acessível onde seja possível conciliar o tráfego pedestre com o ciclista, configurando o Cinturão de Mobilidade Urbana nos limites, Sul e Leste, permitindo ligar por sua vez os...

20 March 2024

12 June 2023

10 June 2023

1 March 2023

22 February 2023

17 August 2022

  • curprev 18:4818:48, 17 August 2022DG Regio talk contribs 49,050 bytes +31,813 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:0309:03, 2 December 2021DG Regio talk contribs 12,307 bytes +1,520 Created claim: summary (P836): L’opération consiste en l’exécution et la continuité dans l’exécution de la piste cyclable ou piste cyclable qui constitue la ceinture de mobilité urbaine de Villanueva de la Serena selon l’itinéraire défini dans le SUMP de la Conurbación Don Benito Villanueva de la Serena. L’objectif est de créer un itinéraire mixte accessible où il est possible de concilier la circulation piétonne avec le cycliste, en configurant la ceinture de mobilité urbain...
  • curprev 09:0309:03, 2 December 2021DG Regio talk contribs 10,787 bytes +124 Changed label, description and/or aliases in fr: translated_label

20 October 2021

12 October 2021

  • curprev 12:2712:27, 12 October 2021DG Regio talk contribs 10,665 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 12:2712:27, 12 October 2021DG Regio talk contribs 10,547 bytes +1,470 Created claim: summary (P836): The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits,...

10 October 2021

9 October 2021

7 October 2021