Revision history of "EDUSI management" (Q3134419)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 10:1810:18, 8 October 2024DG Regio talk contribs 48,475 bytes +8 Set a claim value: summary (P836): Apoiar a atividade de gestão do Programa Operacional através do reforço da gestão das Estratégias de Desenvolvimento Urbano Sustentável e Integrado incluídas no Eixo Prioritário 12 do presente P.O. Tal inclui, nomeadamente, as despesas relacionadas com a externalização de uma equipa de apoio à Entidade Local, os custos de pessoal próprio envolvidos na gestão, as despesas de deslocação necessárias para a gestão e o acompanhamento da Estratégia, tais...

23 March 2024

12 June 2023

10 June 2023

17 August 2022

  • curprev 18:4118:41, 17 August 2022DG Regio talk contribs 47,193 bytes +30,502 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 12,025 bytes +1,475 Created claim: summary (P836): Soutenir l’activité de gestion du programme opérationnel en renforçant la gestion des stratégies de développement urbain durable et intégrée incluses dans l’axe prioritaire 12 du présent P.O. Cela comprend, entre autres, les dépenses liées à l’externalisation d’une équipe d’appui à l’entité locale, les frais de personnel propres liés à la gestion, les frais de voyage nécessaires à la gestion et au suivi de la stratégie, tels que l’assistance aux...
  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 10,550 bytes +72 Changed label, description and/or aliases in fr: translated_label

12 October 2021

  • curprev 12:3212:32, 12 October 2021DG Regio talk contribs 10,478 bytes +75 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3112:31, 12 October 2021DG Regio talk contribs 10,403 bytes +1,419 Created claim: summary (P836): Support the management activity of the Operational Programme by strengthening the management of the Sustainable and Integrated Urban Development Strategies included in Priority Axis 12 of this P.O. This includes, inter alia, expenditure relating to the outsourcing of a support team to the Local Entity, own staff costs involved in management, travel expenses necessary for the management and follow-up of the Strategy such as assistance to monitori...

10 October 2021

9 October 2021

7 October 2021