Revision history of "BOX INTEGRATION SYSTEMS, S.L." (Q3132054)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

29 June 2023

12 June 2023

9 June 2023

22 February 2023

4 August 2022

  • curprev 05:5505:55, 4 August 2022DG Regio talk contribs 42,388 bytes +27,221 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 07:5807:58, 2 December 2021DG Regio talk contribs 11,077 bytes +1,300 Created claim: summary (P836): L’objectif du projet est de développer un point d’accumulation et de production d’énergie photovoltaïque capable de fournir de l’énergie électrique à une installation de type île. La solution que nous concevons a la particularité d’être modulaire et transportable, ce qui signifie qu’une solution complète d’installation et de connexion facile est livrée capable de production et de distribution de masse et de réutiliser autant de fois que nécessai...
  • curprev 07:5807:58, 2 December 2021DG Regio talk contribs 9,777 bytes +103 Changed label, description and/or aliases in fr: translated_label

20 October 2021

10 October 2021

9 October 2021

7 October 2021