Revision history of "ROAD TO THE VILLAGE OF CHALKIOS" (Q3128535)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:3109:31, 10 October 2024DG Regio talk contribs 44,755 bytes +6 Changed label, description and/or aliases in pt
  • curprev 09:3109:31, 10 October 2024DG Regio talk contribs 44,749 bytes +11 Set a claim value: summary (P836): <p>O objeto da operação diz respeito à construção do desvio rodoviário a sul da aldeia de Halkiou ao longo da estrada Chios — Chalkios — Vessa — Agia Irini e à ligação ao desvio rodoviário já construído da aldeia de Zifias. O objetivo é aumentar a capacidade de tráfego e melhorar a segurança rodoviária, uma vez que a estrada existente tem características geométricas e funcionais insuficientes, para a ligação mais segura e rápida dos assentamentos de...

22 March 2024

19 June 2023

11 June 2023

4 August 2022

  • curprev 05:3505:35, 4 August 2022DG Regio talk contribs 44,013 bytes +26,784 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

17 December 2021

7 December 2021

30 November 2021

  • curprev 13:3013:30, 30 November 2021DG Regio talk contribs 11,318 bytes +1,435 Created claim: summary (P836): <p>L’objet de l’opération concerne la construction du contournement routier au sud du village de Halkiou le long de la route de Chios — Chalkios — Vessa — Agia Irini et la connexion à la route de contournement déjà construite du village Zifias. L’objectif est d’accroître la capacité de circulation et d’améliorer la sécurité routière, car la route existante présente des caractéristiques géométriques et fonctionnelles insuffisantes, pour une conne...
  • curprev 13:3013:30, 30 November 2021DG Regio talk contribs 9,883 bytes +92 Changed label, description and/or aliases in fr: translated_label

30 September 2021

  • curprev 12:2812:28, 30 September 2021DG Regio talk contribs 9,791 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 10:0110:01, 30 September 2021DG Regio talk contribs 9,360 bytes +90 Changed label, description and/or aliases in en: translated_label
  • curprev 10:0110:01, 30 September 2021DG Regio talk contribs 9,270 bytes +1,358 Created claim: summary (P836): <p>The object of the operation concerns the construction of the road bypass south of the village of Halkiou along the road road Chios — Chalkios — Vessa — Agia Irini and connection to the already constructed road bypass of the village Zifias. The aim is to increase traffic capacity and improve road safety, as the existing road has insufficient geometric and functional characteristics, for the safer and faster connection of the settlements of Sou...

29 September 2021