Revision history of "Construction of the school in Zámočníckyj street in Medzilaborce" (Q3108240)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:5023:50, 8 October 2024DG Regio talk contribs 75,766 bytes −3 Set a claim value: summary (P836): Atualmente, há duas escolas em Medzilaborce, que não têm capacidade suficiente. Existe atualmente uma situação em que não são criadas condições ótimas para a plena participação das crianças do DLBC no ensino pré-primário. A capacidade da rede de EEM é limitada e os estabelecimentos de ensino são subestimados. Conclui-se do exposto que a capacidade dos jardins de infância na cidade precisa ser ampliada. Portanto, a cidade pretende construir uma nova...

20 March 2024

19 June 2023

10 June 2023

4 August 2022

  • curprev 03:5403:54, 4 August 2022DG Regio talk contribs 75,044 bytes +49,453 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:2622:26, 29 November 2021DG Regio talk contribs 17,448 bytes +2,616 Created claim: summary (P836): Derzeit gibt es zwei Schulen in Medzilaborce, die nicht genug Kapazität sind. Derzeit gibt es eine Situation, in der optimale Bedingungen für die uneingeschränkte Teilnahme von Kindern aus der CLLD an der Vorschulbildung nicht geschaffen werden. Die Kapazität des MES-Netzes ist begrenzt und die Bildungseinrichtungen sind untermaßig. Aus dem Vorstehenden ergibt sich, dass die Kapazität der Kindergärten in der Stadt erweitert werden muss. Daher pl...
  • curprev 22:2622:26, 29 November 2021DG Regio talk contribs 14,832 bytes +115 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:4516:45, 27 November 2021DG Regio talk contribs 14,717 bytes +2,747 Created claim: summary (P836): Il existe actuellement deux écoles à Medzilaborce, qui ne sont pas suffisantes. Il existe actuellement une situation dans laquelle les conditions optimales ne sont pas créées pour assurer la pleine participation des enfants issus du DLAL à l’enseignement préprimaire. La capacité du réseau MES est limitée et les établissements d’enseignement sont sous-dimensionnés. Il résulte de ce qui précède que la capacité des jardins d’enfants dans la ville d...
  • curprev 16:4516:45, 27 November 2021DG Regio talk contribs 11,970 bytes +128 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4414:44, 28 September 2021DG Regio talk contribs 11,842 bytes +2,385 Created claim: summary (P836): There are currently two schools in Medzilaborce, which are not enough capacity. There is currently a situation where optimal conditions are not created for the full participation of children from CLLD in pre-primary education. The capacity of the MES network is limited and educational facilities are undersised. It follows from the above that the capacity of kindergartens in the city needs to be expanded. Therefore, the city plans to build a new...

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:2916:29, 15 September 2021DG Regio talk contribs 11,411 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:3715:37, 15 September 2021DG Regio talk contribs 10,984 bytes +126 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3715:37, 15 September 2021DG Regio talk contribs 10,858 bytes +2,385 Created claim: summary (P836): There are currently two schools in Medzilaborce, which are not enough capacity. There is currently a situation where optimal conditions are not created for the full participation of children from CLLD in pre-primary education. The capacity of the MES network is limited and educational facilities are undersised. It follows from the above that the capacity of kindergartens in the city needs to be expanded. Therefore, the city plans to build a new...

14 September 2021