Revision history of "Dedusting of agglomeration – strip No.2" (Q3108073)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 09:0709:07, 11 October 2024DG Regio talk contribs 75,836 bytes +2 Changed label, description and/or aliases in pt
  • curprev 09:0709:07, 11 October 2024DG Regio talk contribs 75,834 bytes +16 Set a claim value: summary (P836): O projeto de construção do «despoeiramento da aglomeração — cinta n.o 2» apresenta uma proposta de sistema de equipamento tecnológico para a captura, extração e purificação de antenas que contenham poeiras antes da sua descarga para a atmosfera geradas durante o funcionamento da cinta de sinterização n.o 2, que é uma parte separada do nó tecnológico Aglomeração de operação Preparação da produção da unidade de divisão de altos-fornos da U.S. Steel Ko...

20 March 2024

10 June 2023

4 August 2022

  • curprev 03:4903:49, 4 August 2022DG Regio talk contribs 75,093 bytes +48,659 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 23:1323:13, 29 November 2021DG Regio talk contribs 18,137 bytes +2,607 Created claim: summary (P836): Das Projekt für den Bau von „Agglomeration dedusting – Belt Nr. 2“ stellt einen Vorschlag für ein System der technologischen Ausrüstung zur Abscheidung, Gewinnung und Reinigung von Staub enthaltenden Antennen vor seiner Ableitung in die Luft während des Betriebs des Sinterbandes Nr. 2 vor, das ein separater Teil des technologischen Knoten-Aglomerationsbetriebs ist Vorbereitung der Produktion der Hochöfen-Fertigungsanlage in U.S. Steel Košice, s....
  • curprev 23:1323:13, 29 November 2021DG Regio talk contribs 15,530 bytes +108 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 15,422 bytes +2,716 Created claim: summary (P836): Le projet de construction d’«agglomération de dépoussiérage — courroie no 2» présente une proposition de système d’équipements technologiques pour le captage, l’extraction et la purification des antennes contenant des poussières avant leur rejet dans l’air lors de l’exploitation de la courroie de frittage no 2, qui est une partie distincte de l’agglomération technologique d’exploitation des nœuds Préparation de la production de l’usine de la div...
  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 12,706 bytes +111 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4314:43, 28 September 2021DG Regio talk contribs 12,595 bytes +2,567 Created claim: summary (P836): The project for the construction of “agglomeration dedusting – belt No. 2” presents a proposal for a system of technological equipment for the capture, extraction and purification of aerials containing dust prior to its discharge into the air arising during the operation of sintering belt No. 2, which is a separate part of the technological node Aglomeration of operation Preparation of production of the blast furnaces division plant in U.S. Stee...

27 September 2021

23 September 2021

16 September 2021

15 September 2021

  • curprev 15:3815:38, 15 September 2021DG Regio talk contribs 11,737 bytes +100 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3815:38, 15 September 2021DG Regio talk contribs 11,637 bytes +2,567 Created claim: summary (P836): The project for the construction of “agglomeration dedusting – belt No. 2” presents a proposal for a system of technological equipment for the capture, extraction and purification of aerials containing dust prior to its discharge into the air arising during the operation of sintering belt No. 2, which is a separate part of the technological node Aglomeration of operation Preparation of production of the blast furnaces division plant in U.S. Stee...

14 September 2021