Revision history of "Evaluation of OP II in the MH SR (2021-2023)" (Q3107811)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 59,864 bytes +13 Changed label, description and/or aliases in pt
  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 59,851 bytes −22 Set a claim value: summary (P836): O projeto intitulado «Avaliação do PO II sob a responsabilidade do MH SR (2021-2023)» visa financiar o apoio externo no domínio da avaliação do programa operacional sob a responsabilidade do MdE SR, a fim de avaliar a eficácia, a eficiência e o impacto do programa. A execução das atividades criará uma condição prévia fundamental para o reforço da qualidade das atividades realizadas e das funções relacionadas com a preparação, gestão, execução, acomp...

7 March 2024

10 June 2023

4 August 2022

  • curprev 03:4103:41, 4 August 2022DG Regio talk contribs 59,148 bytes +37,922 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:5922:59, 29 November 2021DG Regio talk contribs 14,873 bytes +1,998 Created claim: summary (P836): Das Projekt „Evaluation of OP II unter der Verantwortung des MH SR (2021-2023)“ zielt darauf ab, die externe Unterstützung im Bereich der Evaluierung des operationellen Programms unter der Verantwortung des SR zu finanzieren, um die Wirksamkeit, Effizienz und Wirkung des Programms zu bewerten. Die Durchführung der Maßnahmen wird eine Grundvoraussetzung für die Verbesserung der Qualität der durchgeführten Tätigkeiten und der Aufgaben im Zusammenh...
  • curprev 22:5922:59, 29 November 2021DG Regio talk contribs 12,875 bytes +101 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:3516:35, 27 November 2021DG Regio talk contribs 12,774 bytes +2,011 Created claim: summary (P836): Le projet intitulé «Évaluation du PO II sous la responsabilité de MH SR (2021-2023)» vise à financer un soutien externe dans le domaine de l’évaluation du programme opérationnel sous la responsabilité du Ministère de l’éducation, afin d’évaluer l’efficacité, l’efficience et l’impact du programme. La mise en œuvre des activités créera une condition préalable essentielle au renforcement de la qualité des activités menées et des fonctions liées à l...
  • curprev 16:3516:35, 27 November 2021DG Regio talk contribs 10,763 bytes +105 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4114:41, 28 September 2021DG Regio talk contribs 10,658 bytes +1,928 Created claim: summary (P836): The project entitled “Evaluation of OP II under MH SR’s responsibility (2021-2023)” aims at financing external support in the field of evaluation of the operational programme under the responsibility of the MoE SR in order to assess the effectiveness, efficiency and impact of the programme. The implementation of the activities will create a basic precondition for strengthening the quality of the activities carried out and the functions related t...

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:1516:15, 15 September 2021DG Regio talk contribs 10,226 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:3115:31, 15 September 2021DG Regio talk contribs 9,799 bytes +103 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3115:31, 15 September 2021DG Regio talk contribs 9,696 bytes +1,928 Created claim: summary (P836): The project entitled “Evaluation of OP II under MH SR’s responsibility (2021-2023)” aims at financing external support in the field of evaluation of the operational programme under the responsibility of the MoE SR in order to assess the effectiveness, efficiency and impact of the programme. The implementation of the activities will create a basic precondition for strengthening the quality of the activities carried out and the functions related t...

14 September 2021