Revision history of "Cycle route V9 from Vlčiniec to Water Works – I. section" (Q3107673)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 93,340 bytes −1 Changed label, description and/or aliases in pt
  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 93,341 bytes +116 Set a claim value: summary (P836): O objeto do projeto é a construção da ciclovia V9, secção I. na cidade de Žilina. A ciclovia ligará o assentamento de Vlčince à obra de água de Žilina como a área de recreação ao ar livre mais importante perto da cidade. Através da execução do projeto, serão criados 0,505 km de ciclovias e na cidade de Žilina, alargando assim a rede global de ciclovias na cidade. Os caminhos serão criados através da construção de um caminho separado, principalmente...

7 March 2024

12 June 2023

27 September 2022

4 August 2022

  • curprev 03:3703:37, 4 August 2022DG Regio talk contribs 92,500 bytes +61,700 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:4322:43, 29 November 2021DG Regio talk contribs 20,576 bytes +3,132 Created claim: summary (P836): Gegenstand des Projekts ist der Bau des Radweges V9, Abschnitt I. in der Stadt Žilina. Der Radweg verbindet die Siedlung Vlčince in Richtung der Wasserarbeit Žilina als wichtigstes Erholungsgebiet im Freien in der Nähe der Stadt. Durch die Umsetzung des Projekts werden 0,505 km Radwege und in der Stadt Žilina geschaffen, wodurch das Gesamtnetz der Radwege in der Stadt erweitert wird. Die Wege werden durch den Bau eines separaten Weges geschaffen...
  • curprev 22:4322:43, 29 November 2021DG Regio talk contribs 17,444 bytes +115 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 17,329 bytes +3,430 Created claim: summary (P836): L’objet du projet est la construction de la piste cyclable V9, section I. dans la ville de Žilina. La piste cyclable reliera le village de Vlčince vers le chantier d’eau de Žilina comme zone de loisirs en plein air la plus importante près de la ville. Grâce à la mise en œuvre du projet, 0,505 km de pistes cyclables et dans la ville de Žilina seront créés, ce qui étendra le réseau global de pistes cyclables dans la ville. Les chemins seront créés...
  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 13,899 bytes +125 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4014:40, 28 September 2021DG Regio talk contribs 13,774 bytes +3,217 Created claim: summary (P836): The subject of the project is the construction of the cycle path V9, section I. in the city of Žilina. The cycle path will connect the Vlčince settlement towards the Žilina Water Work as the most important outdoor recreation area near the city. Through the implementation of the project, 0.505 km of cycling paths and in the city of Žilina will be created, thus extending the overall network of cycling routes in the city. The paths will be created...

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:1716:17, 15 September 2021DG Regio talk contribs 13,343 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:3615:36, 15 September 2021DG Regio talk contribs 12,916 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3615:36, 15 September 2021DG Regio talk contribs 12,798 bytes +3,217 Created claim: summary (P836): The subject of the project is the construction of the cycle path V9, section I. in the city of Žilina. The cycle path will connect the Vlčince settlement towards the Žilina Water Work as the most important outdoor recreation area near the city. Through the implementation of the project, 0.505 km of cycling paths and in the city of Žilina will be created, thus extending the overall network of cycling routes in the city. The paths will be created...

14 September 2021