Revision history of "Completion of the H2 cycle path (Solinky – centre)" (Q3107672)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:2909:29, 10 October 2024DG Regio talk contribs 99,775 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:2909:29, 10 October 2024DG Regio talk contribs 99,775 bytes −10 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma ciclovia na cidade de Žilina – especificamente as ciclovias H2, secções III e IV, que ligam a povoação de Solinky e Hliny ao centro da cidade, onde haverá uma ligação a uma rede já existente de ciclovias. O projeto será realizado através de uma atividade principal denominada: Comunicações de ciclismo. O calendário para a execução da atividade é de 9 meses, a partir de 04/2021-12/2021. Será criada uma nova...

22 March 2024

19 June 2023

12 June 2023

27 September 2022

4 August 2022

  • curprev 03:3703:37, 4 August 2022DG Regio talk contribs 99,060 bytes +67,427 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:4322:43, 29 November 2021DG Regio talk contribs 21,178 bytes +3,280 Created claim: summary (P836): Gegenstand des Projekts ist der Bau eines Radweges in der Stadt Žilina – insbesondere die Radwege H2, Abschnitte III und IV, die die Siedlung Solinky und Hliny mit der Innenstadt verbinden, wo es eine Verbindung zu einem bereits bestehenden Netz von Radwegen geben wird. Das Projekt wird durch eine Hauptaktivität realisiert, die heißt: Fahrradkommunikation. Der Zeitplan für die Durchführung der Maßnahme beträgt neun Monate, ab dem 04/2021-12/2021...
  • curprev 22:4322:43, 29 November 2021DG Regio talk contribs 17,898 bytes +113 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 17,785 bytes +3,425 Created claim: summary (P836): L’objet du projet est la construction d’une piste cyclable dans la ville de Žilina — plus précisément les pistes cyclables H2, sections III et IV, reliant le village de Solinky et Hliny au centre-ville, où il y aura une connexion à un réseau déjà existant de pistes cyclables. Le projet sera réalisé par une activité principale appelée: Communications à vélo. Le calendrier de mise en œuvre de l’activité est de 9 mois, du 04/2021 au 12/2021. Une no...
  • curprev 16:3616:36, 27 November 2021DG Regio talk contribs 14,360 bytes +115 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4014:40, 28 September 2021DG Regio talk contribs 14,245 bytes +3,513 Created claim: summary (P836): The subject of the project is the construction of a cycle path in the city of Žilina – specifically the cycle paths H2, sections III and IV, connecting the settlement of Solinky and Hliny to the city center, where there will be a connection to an already existing network of cycling paths. The project will be realised by one main activity called: Cycling communications. The timetable for implementing the activity is 9 months, from 04/2021-12/2021...

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:1716:17, 15 September 2021DG Regio talk contribs 13,814 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:3615:36, 15 September 2021DG Regio talk contribs 13,387 bytes +111 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3615:36, 15 September 2021DG Regio talk contribs 13,276 bytes +3,513 Created claim: summary (P836): The subject of the project is the construction of a cycle path in the city of Žilina – specifically the cycle paths H2, sections III and IV, connecting the settlement of Solinky and Hliny to the city center, where there will be a connection to an already existing network of cycling paths. The project will be realised by one main activity called: Cycling communications. The timetable for implementing the activity is 9 months, from 04/2021-12/2021...

14 September 2021