Revision history of "Reduction of energy intensity at Diago SF, s.r.o." (Q3107154)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:4623:46, 8 October 2024DG Regio talk contribs 63,154 bytes 0 Changed label, description and/or aliases in pt
  • curprev 23:4623:46, 8 October 2024DG Regio talk contribs 63,154 bytes +59 Set a claim value: summary (P836): O projeto proposto aborda a melhoria das propriedades térmicas e técnicas dos edifícios industriais e do edifício administrativo da Diago SF, s.r.o. As estruturas periféricas das estruturas de edifícios – alvenaria de perímetro e estrutura de telhado – serão isoladas e, ao mesmo tempo, as estruturas de abertura serão substituídas. Além disso, está prevista a substituição das luminárias para uma maior eficiência energética e a instalação de duas bomb...

7 March 2024

10 June 2023

4 August 2022

  • curprev 03:2203:22, 4 August 2022DG Regio talk contribs 62,370 bytes +40,099 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:1922:19, 29 November 2021DG Regio talk contribs 15,489 bytes +2,023 Created claim: summary (P836): Das vorgeschlagene Projekt befasst sich mit der Verbesserung der thermischen und technischen Eigenschaften von Industriegebäuden und dem Verwaltungsgebäude von Diago SF, s.r.o.. Isoliert werden die peripheren Strukturen von Bauwerken – Perimeter Mauerwerk und Dachstruktur, und gleichzeitig werden die Öffnungsstrukturen ersetzt. Darüber hinaus ist der Austausch von Leuchten für energieeffizientere und die Installation von zwei Luft-/Wasser-Wärmep...
  • curprev 22:1922:19, 29 November 2021DG Regio talk contribs 13,466 bytes +114 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:2816:28, 27 November 2021DG Regio talk contribs 13,352 bytes +2,193 Created claim: summary (P836): Le projet proposé porte sur l’amélioration des propriétés thermiques et techniques des bâtiments industriels et du bâtiment administratif de Diago SF, s.r.o. Isolés seront les structures périphériques des structures du bâtiment — maçonnerie périmétrique et structure de toit, et en même temps les structures d’ouverture seront remplacées. En outre, le remplacement des luminaires pour une meilleure efficacité énergétique et l’installation de deux p...
  • curprev 16:2816:28, 27 November 2021DG Regio talk contribs 11,159 bytes +121 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:3714:37, 28 September 2021DG Regio talk contribs 11,038 bytes +2,043 Created claim: summary (P836): The proposed project addresses the improvement of the thermal and technical properties of industrial buildings and the administrative building of Diago SF, s.r.o. Insulated will be the peripheral structures of building structures – perimeter masonry and roof structure, and at the same time the opening structures will be replaced. Furthermore, replacement of luminaires for more energy-efficient and installation of two air/water heat pumps is plan...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:5315:53, 15 September 2021DG Regio talk contribs 10,606 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:2415:24, 15 September 2021DG Regio talk contribs 10,179 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 15:2415:24, 15 September 2021DG Regio talk contribs 10,071 bytes +2,043 Created claim: summary (P836): The proposed project addresses the improvement of the thermal and technical properties of industrial buildings and the administrative building of Diago SF, s.r.o. Insulated will be the peripheral structures of building structures – perimeter masonry and roof structure, and at the same time the opening structures will be replaced. Furthermore, replacement of luminaires for more energy-efficient and installation of two air/water heat pumps is plan...

14 September 2021