Revision history of "Reconstruction and construction of paths in the village Kráľovce" (Q3106996)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 89,815 bytes −4 Changed label, description and/or aliases in pt
  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 89,819 bytes +18 Set a claim value: summary (P836): O projeto «Reconstrução e Construção de Caminhos na aldeia de Kráľovce» tem por objeto a reconstrução e construção de novos caminhos na aldeia com um comprimento total de 1886,36 m, que servirão para garantir um melhor acesso às comodidades localizadas no centro da aldeia. O principal objetivo do projeto é apoiar a conclusão de infraestruturas técnicas básicas para dois acampamentos ciganos segregados na aldeia de Kráľovce. Objetivos específicos do...

22 March 2024

19 June 2023

10 June 2023

4 August 2022

  • curprev 03:1703:17, 4 August 2022DG Regio talk contribs 89,076 bytes +59,351 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

23 May 2022

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:0022:00, 29 November 2021DG Regio talk contribs 19,824 bytes +3,100 Created claim: summary (P836): Gegenstand des Projekts „Rekonstruktion und Bau von Pfaden im Dorf Kráľovce“ ist der Wiederaufbau und Bau neuer Wege im Dorf mit einer Gesamtlänge von 1 886,36 m, die einen besseren Zugang zu den Annehmlichkeiten im Zentrum des Dorfes gewährleisten werden. Hauptziel des Projekts ist es, die Fertigstellung der technischen Grundinfrastruktur für zwei getrennte Roma-Siedlungen im Dorf Kráľovce zu unterstützen. Spezifische Ziele des Projekts: Verbes...
  • curprev 22:0022:00, 29 November 2021DG Regio talk contribs 16,724 bytes +101 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:2316:23, 27 November 2021DG Regio talk contribs 16,623 bytes +3,330 Created claim: summary (P836): Le sujet du projet «Reconstruction et construction de sentiers dans le village de Krá’ovce» est la reconstruction et la construction de nouveaux sentiers dans le village d’une longueur totale de 1 886,36 m, ce qui permettra d’assurer un meilleur accès aux commodités situées dans le centre du village. L’objectif principal du projet est d’appuyer l’achèvement de l’infrastructure technique de base pour deux colonies roms séparées dans le village de...
  • curprev 16:2316:23, 27 November 2021DG Regio talk contribs 13,293 bytes +132 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:3614:36, 28 September 2021DG Regio talk contribs 13,161 bytes +3,035 Created claim: summary (P836): The subject of the project “Reconstruction and Construction of Paths in the village Kráľovce” is the reconstruction and construction of new paths in the village with a total length of 1886,36 m, which will serve to ensure better access to amenities located in the center of the village. The main objective of the project is to support the completion of basic technical infrastructure for two segregated Roma settlements in the village Kráľovce. Spec...

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:2016:20, 15 September 2021DG Regio talk contribs 12,730 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:2015:20, 15 September 2021DG Regio talk contribs 12,303 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 15:2015:20, 15 September 2021DG Regio talk contribs 12,178 bytes +3,035 Created claim: summary (P836): The subject of the project “Reconstruction and Construction of Paths in the village Kráľovce” is the reconstruction and construction of new paths in the village with a total length of 1886,36 m, which will serve to ensure better access to amenities located in the center of the village. The main objective of the project is to support the completion of basic technical infrastructure for two segregated Roma settlements in the village Kráľovce. Spec...

14 September 2021