Revision history of "Modernisation of the administrative building ÚVV and ÚVTOS Nitra" (Q3105779)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 58,861 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 58,862 bytes +19 Set a claim value: summary (P836): O objetivo do projeto é alcançar uma solução abrangente para o desempenho energético de um edifício administrativo, garantindo a eficiência energética do edifício durante a sua utilização e reduzindo a intensidade energética (consumo real de energia). O edifício está localizado na área do Instituto da Prisão e do Instituto para a Execução da Prisão, Cintorínska 3, 950 50 Nitra 1. Este objetivo será alcançado através da melhoria do desempenho térmico...

22 March 2024

10 June 2023

4 August 2022

  • curprev 02:4002:40, 4 August 2022DG Regio talk contribs 58,118 bytes +37,009 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 22:0022:00, 29 November 2021DG Regio talk contribs 14,957 bytes +1,907 Created claim: summary (P836): Ziel des Projekts ist es, eine umfassende Lösung für die Gesamtenergieeffizienz eines Verwaltungsgebäudes zu erreichen, die Energieeffizienz des Gebäudes bei gleichzeitiger Nutzung und Verringerung der Energieintensität (Echtenergieverbrauch) zu gewährleisten. Das Gebäude befindet sich im Bereich des Instituts für Gefängnis und des Instituts für die Durchsetzung des Gefängnisses, Cintorínska 3, 950 50 Nitra 1. Dieses Ziel wird erreicht durch die...
  • curprev 22:0022:00, 29 November 2021DG Regio talk contribs 13,050 bytes +120 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:5815:58, 27 November 2021DG Regio talk contribs 12,930 bytes +2,069 Created claim: summary (P836): L’objectif du projet est de parvenir à une solution globale à la performance énergétique d’un bâtiment administratif, en garantissant l’efficacité énergétique du bâtiment tout en l’utilisant et en réduisant l’intensité énergétique (consommation d’énergie réelle). Le bâtiment est situé dans la zone de l’Institut pénitentiaire et de l’Institut pour l’exécution des peines, Cintorínska 3, 950 50 Nitra 1. Cet objectif sera atteint par l’amélioration...
  • curprev 15:5815:58, 27 November 2021DG Regio talk contribs 10,861 bytes +120 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:2714:27, 28 September 2021DG Regio talk contribs 10,741 bytes +1,808 Created claim: summary (P836): The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building, ensuring the energy efficiency of the building while using it and reducing energy intensity (real energy consumption). The building is located in the area of the Institute of Prison and the Institute for the Enforcement of Prison, Cintorínska 3, 950 50 Nitra 1. This objective will be achieved by improving the thermal performance...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:4515:45, 15 September 2021DG Regio talk contribs 10,310 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0815:08, 15 September 2021DG Regio talk contribs 9,883 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 15:0815:08, 15 September 2021DG Regio talk contribs 9,758 bytes +1,808 Created claim: summary (P836): The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building, ensuring the energy efficiency of the building while using it and reducing energy intensity (real energy consumption). The building is located in the area of the Institute of Prison and the Institute for the Enforcement of Prison, Cintorínska 3, 950 50 Nitra 1. This objective will be achieved by improving the thermal performance...

14 September 2021