Revision history of "Improvement of cycling infrastructure in TSK – Part 2: section Nové Mesto nad Váhom – Trenčín" (Q3105383)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 10:0710:07, 8 October 2024DG Regio talk contribs 81,213 bytes +5 Changed label, description and/or aliases in pt
  • curprev 10:0710:07, 8 October 2024DG Regio talk contribs 81,208 bytes +12 Set a claim value: summary (P836): O objetivo do projeto é aumentar a atratividade e a capacidade de transporte da bicicleta para o número total de transportadores. O objetivo fixado será cumprido através da construção de uma nova ciclovia entre Nové Mesto nad Váhom e Trenčín, com uma extensão total de 21,2 km. A ciclovia liga-se à ciclovia já existente Horná Streda – Nové Mesto nad Váhom, com uma extensão de 13,4 km. O projeto contribuirá para a promoção de transportes seguros e res...

23 March 2024

19 June 2023

12 June 2023

4 August 2022

  • curprev 02:2902:29, 4 August 2022DG Regio talk contribs 80,471 bytes +53,589 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 21:3421:34, 29 November 2021DG Regio talk contribs 18,251 bytes +2,762 Created claim: summary (P836): Ziel des Projekts ist es, die Attraktivität und die Transportkapazität des Radfahrens auf die Gesamtzahl der Transporter zu erhöhen. Das gesetzte Ziel wird durch den Bau eines neuen Radwegs zwischen Nové Mesto nad Váhom und Trenčín mit einer Gesamtlänge von 21,2 km erreicht. Die Radroute verbindet mit der bereits bestehenden Radroute Horná Streda – Nové Mesto nad Váhom mit einer Länge von 13,4 km. Das Projekt wird zur Förderung eines sicheren un...
  • curprev 21:3421:34, 29 November 2021DG Regio talk contribs 15,489 bytes +161 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:4515:45, 27 November 2021DG Regio talk contribs 15,328 bytes +2,693 Created claim: summary (P836): L’objectif du projet est d’accroître l’attractivité et la capacité de transport du vélo au nombre total de transporteurs. L’objectif fixé sera atteint en construisant une nouvelle piste cyclable entre Nové Mesto nad Váhom et Trenčín d’une longueur totale de 21,2 km. L’itinéraire cyclable se connecte à la piste cyclable existante Horná Streda — Nové Mesto nad Váhom d’une longueur de 13,4 km. Le projet contribuera à promouvoir des transports sûrs...
  • curprev 15:4515:45, 27 November 2021DG Regio talk contribs 12,635 bytes +169 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:2414:24, 28 September 2021DG Regio talk contribs 12,466 bytes +2,648 Created claim: summary (P836): The aim of the project is to increase the attractiveness and transport capacity of cycling to the total number of transporters. The set target will be fulfilled by building a new cycle path between Nové Mesto nad Váhom and Trenčín with a total length of 21.2 km. The cycle route connects to the already existing cycle route Horná Streda – Nové Mesto nad Váhom with a length of 13.4 km. The project will contribute to the promotion of safe and enviro...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:3215:32, 15 September 2021DG Regio talk contribs 12,035 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0315:03, 15 September 2021DG Regio talk contribs 11,608 bytes +161 Changed label, description and/or aliases in en: translated_label
  • curprev 15:0315:03, 15 September 2021DG Regio talk contribs 11,447 bytes +2,648 Created claim: summary (P836): The aim of the project is to increase the attractiveness and transport capacity of cycling to the total number of transporters. The set target will be fulfilled by building a new cycle path between Nové Mesto nad Váhom and Trenčín with a total length of 21.2 km. The cycle route connects to the already existing cycle route Horná Streda – Nové Mesto nad Váhom with a length of 13.4 km. The project will contribute to the promotion of safe and enviro...

14 September 2021