Revision history of "Modernisation of building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová" (Q3103276)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 10:1310:13, 8 October 2024DG Regio talk contribs 55,479 bytes −19 Changed label, description and/or aliases in pt
  • curprev 10:1310:13, 8 October 2024DG Regio talk contribs 55,498 bytes +9 Set a claim value: summary (P836): O objetivo do projeto é modernizar o edifício operacional n.o 11 do Instituto para a execução da pena de prisão de Nitra-Chrenová, assegurando a eficiência energética do edifício durante a sua utilização e reduzindo a intensidade energética (consumo real de energia). Este objetivo será alcançado através da melhoria das propriedades térmicas e técnicas dos materiais de construção, da modernização dos sistemas instalados no edifício, a fim de reduzir...

7 March 2024

10 June 2023

4 August 2022

  • curprev 01:2701:27, 4 August 2022DG Regio talk contribs 54,764 bytes +34,707 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 21:0021:00, 29 November 2021DG Regio talk contribs 14,333 bytes +1,723 Created claim: summary (P836): Ziel des Projekts ist die Modernisierung des Gebäudes Nr. 11 des Betriebsgebäudes im Institut für die Vollstreckung der Haftstrafe Nitra-Chrenová, um die Energieeffizienz des Gebäudes bei gleichzeitiger Nutzung zu gewährleisten und die Energieintensität (tatsächlicher Energieverbrauch) zu senken. Dieses Ziel wird erreicht, indem die thermischen und technischen Eigenschaften von Baustoffen verbessert, die im Gebäude installierten Systeme modernis...
  • curprev 21:0021:00, 29 November 2021DG Regio talk contribs 12,610 bytes +183 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:3914:39, 27 November 2021DG Regio talk contribs 12,427 bytes +1,802 Created claim: summary (P836): L’objectif de ce projet est de moderniser le bâtiment no 11 de l’Institut pour l’exécution de la peine d’emprisonnement Nitra-Chrenová, d’assurer l’efficacité énergétique du bâtiment tout en l’utilisant et de réduire l’intensité énergétique (consommation d’énergie réelle). Cet objectif sera atteint en améliorant les propriétés thermiques et techniques des matériaux de construction, en modernisant les systèmes installés dans le bâtiment afin de r...
  • curprev 14:3914:39, 27 November 2021DG Regio talk contribs 10,625 bytes +175 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:1014:10, 28 September 2021DG Regio talk contribs 10,450 bytes +1,655 Created claim: summary (P836): The aim of the project is to achieve the modernisation of building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). This objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in ord...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:5015:50, 15 September 2021DG Regio talk contribs 10,002 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:4313:43, 15 September 2021DG Regio talk contribs 9,575 bytes +181 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4313:43, 15 September 2021DG Regio talk contribs 9,394 bytes +1,638 Created claim: summary (P836): The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce t...

14 September 2021