Revision history of "D1 For ov, west For ov, south" (Q3102572)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:3122:31, 9 October 2024DG Regio talk contribs 84,101 bytes −17 Set a claim value: summary (P836): 1. O objectivo do projecto é completar a auto-estrada de base D1, melhorar as condições do tráfego internacional e nacional e aumentar a fluidez, a capacidade, a velocidade e a segurança rodoviária. Após a conclusão da construção da secção D1 num comprimento de 7,87 km, serão criadas condições para uma redução substancial do tráfego na estrada I/68 e na estrada I/18 (desvio do tráfego de mercadorias em trânsito e de passageiros da cidade de Prešov)....

20 March 2024

19 June 2023

10 June 2023

4 August 2022

  • curprev 01:0801:08, 4 August 2022DG Regio talk contribs 83,393 bytes +55,095 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 21:3421:34, 29 November 2021DG Regio talk contribs 19,025 bytes +2,980 Created claim: summary (P836): 1. Ziel des Projekts ist es, die Basisautobahn D1 zu vervollständigen, die Bedingungen für den internationalen und nationalen Verkehr zu verbessern und die Fluidität, Kapazität, Geschwindigkeit und Straßenverkehrssicherheit zu erhöhen. Nach Abschluss des Baus des Abschnitts D1 in der Länge von 7,87 km werden Bedingungen für eine erhebliche Verringerung des Verkehrsaufkommens auf der Straße I/68 und der Straße I/18 (Abweichung des Transit- und Pe...
  • curprev 21:3421:34, 29 November 2021DG Regio talk contribs 16,045 bytes +92 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:4013:40, 27 November 2021DG Regio talk contribs 15,953 bytes +3,124 Created claim: summary (P836): 1. L’objectif du projet est d’achever l’autoroute de base D1, d’améliorer les conditions de circulation internationale et nationale et d’accroître la fluidité, la capacité, la vitesse et la sécurité routière. Après l’achèvement de la construction du tronçon D1 d’une longueur de 7,87 km, des conditions seront créées pour une réduction substantielle du trafic sur la route I/68 et la route I/18 (écart du trafic de marchandises et de passagers en tr...
  • curprev 13:4013:40, 27 November 2021DG Regio talk contribs 12,829 bytes +92 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:0614:06, 28 September 2021DG Regio talk contribs 12,737 bytes +2,851 Created claim: summary (P836): 1. The aim of the project is to complete the basic motorway D1, improve conditions for international and national traffic and increase fluidity, capacity, speed and road safety. After the completion of the construction of the section D1 in the length of 7.87 km, conditions will be created for a substantial reduction of traffic on road I/68 and road I/18 (deviation of transit freight and passenger traffic from the city of Prešov).2. The activitie...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:3415:34, 15 September 2021DG Regio talk contribs 12,308 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:5413:54, 15 September 2021DG Regio talk contribs 11,881 bytes +88 Changed label, description and/or aliases in en: translated_label
  • curprev 13:5413:54, 15 September 2021DG Regio talk contribs 11,793 bytes +2,863 Created claim: summary (P836): 1. The aim of the project is to complete the basic D1 diažnice ahu, improve conditions for international and national traffic and increase the flow, capacity, speed and at the same time road safety. After the completion of the construction of the D1 section in question in the 7.87 km line, conditions will be created for the substantial relaxation of traffic on road I/68 and road I/18 (departure of transit freight and passenger traffic from Preov...

14 September 2021