Revision history of "Reducing energy intensity in INT-COR" (Q3102566)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:3823:38, 8 October 2024DG Regio talk contribs 82,658 bytes 0 Changed label, description and/or aliases in pt
  • curprev 23:3823:38, 8 October 2024DG Regio talk contribs 82,658 bytes +26 Set a claim value: summary (P836): A Comissão INT-COR reflete sobre um dos problemas atuais, que é a elevada energia e, por conseguinte, a intensidade económica, que consiste no desgaste do edifício de produção, incluindo os meios de aquecimento e a iluminação. O projeto INT-COR aborda a melhoria da eficiência energética e, por conseguinte, económica, através da renovação e modernização do edifício de produção e da introdução de equipamento para a utilização de FER. O projeto divide-...

22 March 2024

10 June 2023

4 August 2022

  • curprev 01:0701:07, 4 August 2022DG Regio talk contribs 81,907 bytes +54,425 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 21:3521:35, 29 November 2021DG Regio talk contribs 18,531 bytes +2,802 Created claim: summary (P836): INT-COR reflektiert eines der aktuellen Probleme, die hohe Energie und damit wirtschaftliche Intensität sind, bestehend aus dem Verschleiß des Produktionsgebäudes, einschließlich Heizmedien und Beleuchtung. Das INT-COR-Projekt befasst sich mit der Verbesserung der Energie und damit der wirtschaftlichen Effizienz durch die Renovierung und Modernisierung des Produktionsgebäudes und die Einführung von Geräten für die Nutzung von RES. Das Projekt is...
  • curprev 21:3521:35, 29 November 2021DG Regio talk contribs 15,729 bytes +106 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:4013:40, 27 November 2021DG Regio talk contribs 15,623 bytes +3,056 Created claim: summary (P836): INT-COR se penche sur l’un des problèmes actuels, à savoir l’énergie élevée et donc l’intensité économique, à savoir l’usure du bâtiment de production, y compris le chauffage et l’éclairage. Le projet INT-COR porte sur l’amélioration de l’énergie et donc de l’efficacité économique par la rénovation et la modernisation du bâtiment de production et l’introduction d’équipements pour l’utilisation des SER. Le projet est divisé en deux activités prin...
  • curprev 13:4013:40, 27 November 2021DG Regio talk contribs 12,567 bytes +112 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:0614:06, 28 September 2021DG Regio talk contribs 12,455 bytes +2,666 Created claim: summary (P836): INT-COR reflects on one of the current problems, which is high energy and thus economic intensity, consisting of the wear of the production building, including heating media and lighting. The INT-COR project addresses the improvement of energy and thus economic efficiency through the renovation and modernisation of the production building and the introduction of equipment for the use of RES. The project is divided into two main activities. The m...

27 September 2021

23 September 2021

15 September 2021

  • curprev 15:3415:34, 15 September 2021DG Regio talk contribs 12,036 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:5313:53, 15 September 2021DG Regio talk contribs 11,609 bytes +95 Changed label, description and/or aliases in en: translated_label
  • curprev 13:5313:53, 15 September 2021DG Regio talk contribs 11,514 bytes +2,679 Created claim: summary (P836): INT-COR reflects one of the current problems, which is high energy and thus economic demand, consisting of the wear and tear of a production building, including heating media and lighting. The INT-COR project addresses the increase in energy and thus economic efficiency through the reconstruction and modernisation of the production building and the introduction of RES use equipment. The project is divided into two main activities. The main activ...

14 September 2021