Revision history of "Reducing the energy intensity of the industrial building REMOZA s.r.o." (Q3102508)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:2009:20, 10 October 2024DG Regio talk contribs 72,312 bytes −3 Changed label, description and/or aliases in pt
  • curprev 09:2009:20, 10 October 2024DG Regio talk contribs 72,315 bytes −8 Set a claim value: summary (P836): O principal objetivo do nosso projeto é reduzir o consumo de energia na operação do edifício industrial da REMOZA s.r.o. através da implementação da combinação ideal de medidas de poupança de energia resultantes da auditoria energética. Este objetivo está em consonância com o objetivo específico do convite à apresentação de propostas 4.2.1 «Reduzir a intensidade energética e aumentar a utilização de FER nas empresas», bem como com a prioridade de in...

22 March 2024

10 June 2023

4 August 2022

  • curprev 01:0601:06, 4 August 2022DG Regio talk contribs 71,598 bytes +46,603 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 21:3621:36, 29 November 2021DG Regio talk contribs 16,967 bytes +2,370 Created claim: summary (P836): Hauptziel unseres Projekts ist es, den Energieverbrauch im Betrieb des Industriegebäudes von REMOZA s.r.o. durch die Umsetzung der optimalen Kombination von Energieeinsparungsmaßnahmen, die sich aus dem Energieaudit ergeben, zu reduzieren. Dieses Ziel steht im Einklang mit dem spezifischen Ziel der Aufforderung 4.2.1 Verringerung der Energieintensität und Steigerung der Nutzung von EE in Unternehmen sowie mit der Investitionspriorität und der Pr...
  • curprev 21:3621:36, 29 November 2021DG Regio talk contribs 14,597 bytes +135 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:4113:41, 27 November 2021DG Regio talk contribs 14,462 bytes +2,606 Created claim: summary (P836): L’objectif principal de notre projet est de réduire la consommation d’énergie dans le fonctionnement du bâtiment industriel de REMOZA s.r.o. grâce à la mise en œuvre de la combinaison optimale de mesures d’économie d’énergie résultant de l’audit énergétique. Cet objectif est conforme à l’objectif spécifique de l’appel 4.2.1 Réduire l’intensité énergétique et accroître l’utilisation des SER dans les entreprises, ainsi qu’avec la priorité d’invest...
  • curprev 13:4113:41, 27 November 2021DG Regio talk contribs 11,856 bytes +143 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:0514:05, 28 September 2021DG Regio talk contribs 11,713 bytes +2,367 Created claim: summary (P836): The main objective of our project is to reduce energy consumption in the operation of the industrial building of REMOZA s.r.o. through the implementation of the optimal combination of energy saving measures resulting from the energy audit. This objective is in line with the specific objective of Call 4.2.1 Reducing energy intensity and increasing the use of RES in enterprises, as well as with the investment priority and priority axis of the OPE....

27 September 2021

23 September 2021

15 September 2021

  • curprev 16:1116:11, 15 September 2021DG Regio talk contribs 11,283 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:5313:53, 15 September 2021DG Regio talk contribs 10,856 bytes +129 Changed label, description and/or aliases in en: translated_label
  • curprev 13:5313:53, 15 September 2021DG Regio talk contribs 10,727 bytes +2,373 Created claim: summary (P836): The main objective of our project is to reduce energy consumption in the operation of the industrial building of REMOZA s.r.o. through the implementation of the optimal combination of energy saving measures resulting from the energy audit. This objective is in line with the specific objective of Call 4.2.1 Reducing energy intensity and increasing the use of RES in enterprises, as well as with the investment priority and priority axis of the OP K...

14 September 2021